{"title":"没有合同基础案例的公私伙伴关系:","authors":"A. Martins","doi":"10.21552/epppl/2023/1/7","DOIUrl":null,"url":null,"abstract":"The purpose of this article is to discuss a method for compensating a private concession-aire for cash flow losses related to Covid-19 suffered in 2020 and 2021. The analysis is based on a public-private partnership (PPP) set up to exploit surface parking lots, signed between a Portuguese municipality and a private corporation. The contract has no financial base case. The article concludes that a base case is not an obstacle to calculate this type of compensation, that the previous performance of the contractor is a reasonable basis to estimate losses and the forecasts extending to 2026 are a good schema with which to estimate the extension of the concession period claimed by the Petitioner. The arbitration court deciding the corporation's claim has valid reasons for an equitable decision. © 2023, Lexxion Verlagsgesellschaft mbH. All rights reserved.","PeriodicalId":176734,"journal":{"name":"European Procurement & Public Private Partnership Law Review","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Public-Private Partnerships with No Contractual Base Case:\",\"authors\":\"A. Martins\",\"doi\":\"10.21552/epppl/2023/1/7\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The purpose of this article is to discuss a method for compensating a private concession-aire for cash flow losses related to Covid-19 suffered in 2020 and 2021. The analysis is based on a public-private partnership (PPP) set up to exploit surface parking lots, signed between a Portuguese municipality and a private corporation. The contract has no financial base case. The article concludes that a base case is not an obstacle to calculate this type of compensation, that the previous performance of the contractor is a reasonable basis to estimate losses and the forecasts extending to 2026 are a good schema with which to estimate the extension of the concession period claimed by the Petitioner. The arbitration court deciding the corporation's claim has valid reasons for an equitable decision. © 2023, Lexxion Verlagsgesellschaft mbH. All rights reserved.\",\"PeriodicalId\":176734,\"journal\":{\"name\":\"European Procurement & Public Private Partnership Law Review\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"European Procurement & Public Private Partnership Law Review\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.21552/epppl/2023/1/7\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"European Procurement & Public Private Partnership Law Review","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21552/epppl/2023/1/7","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0