{"title":"规划马朗市哈佑诺山的行人路设计","authors":"Vivia Tiur Landhina, Burhamtoro Burhamtoro, Dwi Ratnaningsih","doi":"10.55404/jos-mrk.2021.02.03.144-149","DOIUrl":null,"url":null,"abstract":"MT. Haryono Street is an area of ​​shops, hospitals, schools, campuses, markets and malls. However, several problems encountered in the field include unavailability of pedestrian facilities, damaged sidewalks and the conversion of sidewalks causing pedestrians to use the road body to walk. The research location is taken along the Dinoyo Intersection to Water Reservoir Tlogomas the distance of approximately 0.97 km which is divided into 17 observation segments. Desaign planning for good pedestrian path will provide a sense of security and comfort so that it does not cause intersection, avoids conflicts and does not walk on the road, which of course endangers pedestrian safety. The method used in this planning is a pedestrian facility performance analysis and pedestrian path design. Based on the results and discussion above, it can be concluded that the pedestrian path design planning with a width of 1.50 m assumes the need for two people. The sidewalk slope of 2% for the purpose of channeling surface water with the direction of the slope of the surface adjusted to the drainage plan. The planned ramps are placed at driveways, intersections and pedestrian crossings with an 8% slope rate.","PeriodicalId":337938,"journal":{"name":"Jurnal JOS-MRK","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-09-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"PERENCANAAN DESAIN JALUR PEJALAN KAKI PADA JALAN MT. HARYONO KOTA MALANG\",\"authors\":\"Vivia Tiur Landhina, Burhamtoro Burhamtoro, Dwi Ratnaningsih\",\"doi\":\"10.55404/jos-mrk.2021.02.03.144-149\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"MT. Haryono Street is an area of ​​shops, hospitals, schools, campuses, markets and malls. However, several problems encountered in the field include unavailability of pedestrian facilities, damaged sidewalks and the conversion of sidewalks causing pedestrians to use the road body to walk. The research location is taken along the Dinoyo Intersection to Water Reservoir Tlogomas the distance of approximately 0.97 km which is divided into 17 observation segments. Desaign planning for good pedestrian path will provide a sense of security and comfort so that it does not cause intersection, avoids conflicts and does not walk on the road, which of course endangers pedestrian safety. The method used in this planning is a pedestrian facility performance analysis and pedestrian path design. Based on the results and discussion above, it can be concluded that the pedestrian path design planning with a width of 1.50 m assumes the need for two people. The sidewalk slope of 2% for the purpose of channeling surface water with the direction of the slope of the surface adjusted to the drainage plan. The planned ramps are placed at driveways, intersections and pedestrian crossings with an 8% slope rate.\",\"PeriodicalId\":337938,\"journal\":{\"name\":\"Jurnal JOS-MRK\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-09-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal JOS-MRK\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.55404/jos-mrk.2021.02.03.144-149\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal JOS-MRK","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.55404/jos-mrk.2021.02.03.144-149","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

MT. Haryono街是商店、医院、学校、校园、市场和购物中心的聚集地。然而,在该领域遇到的几个问题包括没有行人设施,人行道损坏和人行道改建导致行人使用道路体行走。研究地点沿迪诺约十字路口至托洛马水库约0.97 km,共划分17个观测段。设计规划好的步道会给人一种安全感和舒适感,使其不会产生交叉,避免冲突,不会走在路上,这当然会危及行人的安全。规划中使用的方法是行人设施性能分析和行人路径设计。根据以上的结果和讨论,可以得出,宽度为1.50 m的人行路径设计规划假设需要两人。人行道坡度为2%,以疏导地表水为目的,并将地表坡度方向调整为排水方案。计划中的坡道位于车道、十字路口和人行横道,坡度为8%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
PERENCANAAN DESAIN JALUR PEJALAN KAKI PADA JALAN MT. HARYONO KOTA MALANG
MT. Haryono Street is an area of ​​shops, hospitals, schools, campuses, markets and malls. However, several problems encountered in the field include unavailability of pedestrian facilities, damaged sidewalks and the conversion of sidewalks causing pedestrians to use the road body to walk. The research location is taken along the Dinoyo Intersection to Water Reservoir Tlogomas the distance of approximately 0.97 km which is divided into 17 observation segments. Desaign planning for good pedestrian path will provide a sense of security and comfort so that it does not cause intersection, avoids conflicts and does not walk on the road, which of course endangers pedestrian safety. The method used in this planning is a pedestrian facility performance analysis and pedestrian path design. Based on the results and discussion above, it can be concluded that the pedestrian path design planning with a width of 1.50 m assumes the need for two people. The sidewalk slope of 2% for the purpose of channeling surface water with the direction of the slope of the surface adjusted to the drainage plan. The planned ramps are placed at driveways, intersections and pedestrian crossings with an 8% slope rate.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
ANALISIS STABILITAS TUBUH BENDUNGAN PADA BENDUNGAN SEMANTOK KABUPATEN NGANJUK PROVINSI JAWA TIMUR ANALISA PERPANJANGAN LANDASAN PACU PADA BANDAR UDARA ABDULRACHMAN SALEH MALANG (STA 2+250 – STA 3+000) EVALUASI DAN PERENCANAAN ULANG SISTEM JARINGAN DRAINASE KECAMATAN KARTOHARJO KOTA MADIUN ANALISA KERUSAKAN JALAN MENGGUNAKAN METODE BINA MARGA PADA JALAN RAYA JERU – JALAN RAYA TUMPANG KABUPATEN MALANG PERENCANAAN ULANG STRUKTUR ATAS DAN RAB GEDUNG KULIAH AKN PUTRA SANG FAJAR
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1