ISDN网络终端1 (NT1)的电源和备用电源考虑

K. Mistry, K. Moisan, T. D. O'sullivan
{"title":"ISDN网络终端1 (NT1)的电源和备用电源考虑","authors":"K. Mistry, K. Moisan, T. D. O'sullivan","doi":"10.1109/INTLEC.1990.171219","DOIUrl":null,"url":null,"abstract":"The evolution to a narrowband integrated services digital network (ISDN) necessitates the installation of additional electronics at the user end of the loop. Providing power and backup power for these electronics (referred to as the network termination 1 (NT1)) offers challenges to designers. One problem is that reliability and backup powering are not currently addressed in a uniform manner in the US. For locally provided power, the authors propose baseline criteria for reliability and backup powering. One generic topology comprising a power supply, a battery charger, and secondary batteries is presented. A backup time of eight hours is proposed with an option for additional backup provided via an extended reserve cabinet using primary or secondary batteries.<<ETX>>","PeriodicalId":264940,"journal":{"name":"12th International Conference on Telecommunications Energy","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"1990-10-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Power and backup power considerations for the ISDN network termination 1 (NT1)\",\"authors\":\"K. Mistry, K. Moisan, T. D. O'sullivan\",\"doi\":\"10.1109/INTLEC.1990.171219\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The evolution to a narrowband integrated services digital network (ISDN) necessitates the installation of additional electronics at the user end of the loop. Providing power and backup power for these electronics (referred to as the network termination 1 (NT1)) offers challenges to designers. One problem is that reliability and backup powering are not currently addressed in a uniform manner in the US. For locally provided power, the authors propose baseline criteria for reliability and backup powering. One generic topology comprising a power supply, a battery charger, and secondary batteries is presented. A backup time of eight hours is proposed with an option for additional backup provided via an extended reserve cabinet using primary or secondary batteries.<<ETX>>\",\"PeriodicalId\":264940,\"journal\":{\"name\":\"12th International Conference on Telecommunications Energy\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1990-10-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"12th International Conference on Telecommunications Energy\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/INTLEC.1990.171219\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"12th International Conference on Telecommunications Energy","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/INTLEC.1990.171219","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

向窄带综合业务数字网(ISDN)的演进需要在环路的用户端安装额外的电子设备。为这些电子设备提供电源和备用电源(称为网络终端1 (NT1))对设计人员提出了挑战。一个问题是,可靠性和备用电源目前在美国没有统一的解决方式。对于本地供电,作者提出了可靠性和备用供电的基线标准。提出了一种通用拓扑结构,包括电源、电池充电器和二次电池。建议的备用时间为8小时,并可通过使用一次或二次电池的扩展备用柜提供额外备用
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Power and backup power considerations for the ISDN network termination 1 (NT1)
The evolution to a narrowband integrated services digital network (ISDN) necessitates the installation of additional electronics at the user end of the loop. Providing power and backup power for these electronics (referred to as the network termination 1 (NT1)) offers challenges to designers. One problem is that reliability and backup powering are not currently addressed in a uniform manner in the US. For locally provided power, the authors propose baseline criteria for reliability and backup powering. One generic topology comprising a power supply, a battery charger, and secondary batteries is presented. A backup time of eight hours is proposed with an option for additional backup provided via an extended reserve cabinet using primary or secondary batteries.<>
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Thermal baffling of batteries in a simulated optical network unit: thermal design and analysis Airflow distribution in telecommunications equipment rooms A novel high frequency PWM push-pull inverter generates sinusoidal output voltage at 50 Hz Problems and solutions pertaining to the use of lead-acid batteries used in power supplies for electronic equipment A novel frequency domain modelling of a series resonant DC/DC converter
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1