{"title":"利用经验率函数对输电线路进行过载概率排序","authors":"Brendan Patch, B. Zwart","doi":"10.1109/PMAPS47429.2020.9183567","DOIUrl":null,"url":null,"abstract":"We develop a non-parametric procedure for ranking transmission lines in a power system according to the probability that they will overload due to stochastic renewable generation or demand-side load fluctuations, and compare this procedure to several benchmark approaches. Using the IEEE 39-bus test network we provide evidence that our approach, which statistically estimates the rate function for each line, is highly promising relative to alternative methods which count overload events or use incorrect parametric assumptions.","PeriodicalId":126918,"journal":{"name":"2020 International Conference on Probabilistic Methods Applied to Power Systems (PMAPS)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2020-02-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Ranking transmission lines by overload probability using the empirical rate function\",\"authors\":\"Brendan Patch, B. Zwart\",\"doi\":\"10.1109/PMAPS47429.2020.9183567\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"We develop a non-parametric procedure for ranking transmission lines in a power system according to the probability that they will overload due to stochastic renewable generation or demand-side load fluctuations, and compare this procedure to several benchmark approaches. Using the IEEE 39-bus test network we provide evidence that our approach, which statistically estimates the rate function for each line, is highly promising relative to alternative methods which count overload events or use incorrect parametric assumptions.\",\"PeriodicalId\":126918,\"journal\":{\"name\":\"2020 International Conference on Probabilistic Methods Applied to Power Systems (PMAPS)\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-02-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2020 International Conference on Probabilistic Methods Applied to Power Systems (PMAPS)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PMAPS47429.2020.9183567\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 International Conference on Probabilistic Methods Applied to Power Systems (PMAPS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PMAPS47429.2020.9183567","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Ranking transmission lines by overload probability using the empirical rate function
We develop a non-parametric procedure for ranking transmission lines in a power system according to the probability that they will overload due to stochastic renewable generation or demand-side load fluctuations, and compare this procedure to several benchmark approaches. Using the IEEE 39-bus test network we provide evidence that our approach, which statistically estimates the rate function for each line, is highly promising relative to alternative methods which count overload events or use incorrect parametric assumptions.