{"title":"利用Simulink和单个PC机对小型配电馈线进行实时仿真","authors":"F. Uriarte, K. Butler-Purry","doi":"10.1109/NAPS.2005.1560527","DOIUrl":null,"url":null,"abstract":"This work documents the implications, methodology, and results of modeling a power system in real-time using a single PC; offline and real-time results are both presented. It is known that a single PC running Windows cannot guarantee real-time performance, especially for higher order systems. Nonetheless, using the suggested optimizations real-time simulation times are achieved on a same computer. The system modeled is a three-phase radial system consisting of breakers, an autotransformer, two parallel transmission lines, switchable loads, and an induction motor. Among the targets provided by the real-time workshop for single PC prototyping, the generic real-time target (GRT) was used.","PeriodicalId":101495,"journal":{"name":"Proceedings of the 37th Annual North American Power Symposium, 2005.","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2005-12-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Real-time simulation of a small-scale distribution feeder using Simulink and a single PC\",\"authors\":\"F. Uriarte, K. Butler-Purry\",\"doi\":\"10.1109/NAPS.2005.1560527\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This work documents the implications, methodology, and results of modeling a power system in real-time using a single PC; offline and real-time results are both presented. It is known that a single PC running Windows cannot guarantee real-time performance, especially for higher order systems. Nonetheless, using the suggested optimizations real-time simulation times are achieved on a same computer. The system modeled is a three-phase radial system consisting of breakers, an autotransformer, two parallel transmission lines, switchable loads, and an induction motor. Among the targets provided by the real-time workshop for single PC prototyping, the generic real-time target (GRT) was used.\",\"PeriodicalId\":101495,\"journal\":{\"name\":\"Proceedings of the 37th Annual North American Power Symposium, 2005.\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2005-12-19\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the 37th Annual North American Power Symposium, 2005.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/NAPS.2005.1560527\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 37th Annual North American Power Symposium, 2005.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/NAPS.2005.1560527","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

这项工作记录的含义,方法和结果建模的电力系统在实时使用单个PC机;离线和实时结果同时呈现。众所周知,一台运行Windows的PC无法保证实时性能,特别是对于高阶系统。尽管如此,使用建议的优化可以在同一台计算机上实现实时模拟时间。该系统是一个三相径向系统,由断路器、自耦变压器、两条并联传输线、可切换负载和感应电动机组成。在单机样机实时车间提供的目标中,采用了通用实时目标(GRT)。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Real-time simulation of a small-scale distribution feeder using Simulink and a single PC
This work documents the implications, methodology, and results of modeling a power system in real-time using a single PC; offline and real-time results are both presented. It is known that a single PC running Windows cannot guarantee real-time performance, especially for higher order systems. Nonetheless, using the suggested optimizations real-time simulation times are achieved on a same computer. The system modeled is a three-phase radial system consisting of breakers, an autotransformer, two parallel transmission lines, switchable loads, and an induction motor. Among the targets provided by the real-time workshop for single PC prototyping, the generic real-time target (GRT) was used.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Linear complexity search algorithm to locate shunt and series compensation for enhancing voltage stability Economic assessment of distributed generation using life cycle costs and environmental externalities PRA for vulnerability assessment of power system infrastructure security Feasibility study of a high-voltage DC & AC multi-circuit hybrid transmission line A V-I slope-based method for flicker source detection
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1