电信工程项目的进度管理——以本地网络设计项目为例

Liu Yuan, Zhang Huarong
{"title":"电信工程项目的进度管理——以本地网络设计项目为例","authors":"Liu Yuan, Zhang Huarong","doi":"10.1109/IMCEC.2016.7867277","DOIUrl":null,"url":null,"abstract":"This study takes the local network design project of C Telecommunication operator in Yunnan (China) in 2014 as an example, uses a combination of schedule management principle and related methods to analysis how to ensure the quality and control the cost at the same time. In order to win customers in the fierce competition of telecommunication design market, some activities must be carried out, like project decomposition, job ranking, duration estimation, scheduling and others. And some measures helps to optimize the schedule management of the design project are also very important, like baseline setting, regular meeting and process tracking.","PeriodicalId":218222,"journal":{"name":"2016 IEEE Advanced Information Management, Communicates, Electronic and Automation Control Conference (IMCEC)","volume":"79 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Schedule management in Telecommunication engineering project — a case study of local network design project\",\"authors\":\"Liu Yuan, Zhang Huarong\",\"doi\":\"10.1109/IMCEC.2016.7867277\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This study takes the local network design project of C Telecommunication operator in Yunnan (China) in 2014 as an example, uses a combination of schedule management principle and related methods to analysis how to ensure the quality and control the cost at the same time. In order to win customers in the fierce competition of telecommunication design market, some activities must be carried out, like project decomposition, job ranking, duration estimation, scheduling and others. And some measures helps to optimize the schedule management of the design project are also very important, like baseline setting, regular meeting and process tracking.\",\"PeriodicalId\":218222,\"journal\":{\"name\":\"2016 IEEE Advanced Information Management, Communicates, Electronic and Automation Control Conference (IMCEC)\",\"volume\":\"79 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2016 IEEE Advanced Information Management, Communicates, Electronic and Automation Control Conference (IMCEC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IMCEC.2016.7867277\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 IEEE Advanced Information Management, Communicates, Electronic and Automation Control Conference (IMCEC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IMCEC.2016.7867277","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本研究以2014年中国云南C电信运营商本地网络设计项目为例,运用进度管理原理和相关方法相结合的方法,分析如何在保证质量的同时控制成本。为了在电信设计市场的激烈竞争中赢得客户,必须进行一些活动,如项目分解、工作排序、工期估算、调度等。而优化设计项目进度管理的一些措施也非常重要,如基线设置、定期会议和进度跟踪等。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Schedule management in Telecommunication engineering project — a case study of local network design project
This study takes the local network design project of C Telecommunication operator in Yunnan (China) in 2014 as an example, uses a combination of schedule management principle and related methods to analysis how to ensure the quality and control the cost at the same time. In order to win customers in the fierce competition of telecommunication design market, some activities must be carried out, like project decomposition, job ranking, duration estimation, scheduling and others. And some measures helps to optimize the schedule management of the design project are also very important, like baseline setting, regular meeting and process tracking.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
High performance path following for UAV based on advanced vector field guidance law Design of autonomous underwater vehicle positioning system Temperature field simulation of herringbone grooved bearing based on FLUENT software Docker based overlay network performance evaluation in large scale streaming system Multi-channel automatic calibration system of pressure sensor
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1