{"title":"结构不可预测问题的分散调度","authors":"Minyou Wu, W. Shu","doi":"10.1109/DMCC.1991.633106","DOIUrl":null,"url":null,"abstract":"An extended scatter scheduling was applied to problems with unpredictable, asynchronous struc- tures. It has been found that with this simple schedul- ing strategy, good load balance can be reached with- out incurring much runtime overhead. This scheduling algorithm has been implemented on hypercube ma- chines, and its performance is compared with other scheduling strategies.","PeriodicalId":313314,"journal":{"name":"The Sixth Distributed Memory Computing Conference, 1991. Proceedings","volume":"65 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1991-04-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":"{\"title\":\"Scatter Scheduling for Problems with Unpredictable Structures\",\"authors\":\"Minyou Wu, W. Shu\",\"doi\":\"10.1109/DMCC.1991.633106\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"An extended scatter scheduling was applied to problems with unpredictable, asynchronous struc- tures. It has been found that with this simple schedul- ing strategy, good load balance can be reached with- out incurring much runtime overhead. This scheduling algorithm has been implemented on hypercube ma- chines, and its performance is compared with other scheduling strategies.\",\"PeriodicalId\":313314,\"journal\":{\"name\":\"The Sixth Distributed Memory Computing Conference, 1991. Proceedings\",\"volume\":\"65 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1991-04-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"5\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"The Sixth Distributed Memory Computing Conference, 1991. Proceedings\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/DMCC.1991.633106\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"The Sixth Distributed Memory Computing Conference, 1991. Proceedings","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/DMCC.1991.633106","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Scatter Scheduling for Problems with Unpredictable Structures
An extended scatter scheduling was applied to problems with unpredictable, asynchronous struc- tures. It has been found that with this simple schedul- ing strategy, good load balance can be reached with- out incurring much runtime overhead. This scheduling algorithm has been implemented on hypercube ma- chines, and its performance is compared with other scheduling strategies.