{"title":"确定项目任务成本的分析估计方法","authors":"Stefan Csösz","doi":"10.51257/f-1542","DOIUrl":null,"url":null,"abstract":"Pour estimer les couts d’un projet, la methode analytique est la plus utilisee et la plus intuitive puisqu’elle invite a estimer le cout des tâches au plus proche des activites prevues lors de la phase d’execution. Cette methode fournit ainsi un degre d’exactitude des estimations de l’ordre de 5 % alors que d’autres methodes d’estimation comme celle de la methode parametrique ont une fiabilite de seulement 20 %.","PeriodicalId":153578,"journal":{"name":"Métier : responsable bureau d’étude/conception","volume":"54 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Méthode analytique d’estimation pour déterminer les coûts des tâches d’un projet\",\"authors\":\"Stefan Csösz\",\"doi\":\"10.51257/f-1542\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Pour estimer les couts d’un projet, la methode analytique est la plus utilisee et la plus intuitive puisqu’elle invite a estimer le cout des tâches au plus proche des activites prevues lors de la phase d’execution. Cette methode fournit ainsi un degre d’exactitude des estimations de l’ordre de 5 % alors que d’autres methodes d’estimation comme celle de la methode parametrique ont une fiabilite de seulement 20 %.\",\"PeriodicalId\":153578,\"journal\":{\"name\":\"Métier : responsable bureau d’étude/conception\",\"volume\":\"54 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-05-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Métier : responsable bureau d’étude/conception\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.51257/f-1542\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Métier : responsable bureau d’étude/conception","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.51257/f-1542","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Méthode analytique d’estimation pour déterminer les coûts des tâches d’un projet
Pour estimer les couts d’un projet, la methode analytique est la plus utilisee et la plus intuitive puisqu’elle invite a estimer le cout des tâches au plus proche des activites prevues lors de la phase d’execution. Cette methode fournit ainsi un degre d’exactitude des estimations de l’ordre de 5 % alors que d’autres methodes d’estimation comme celle de la methode parametrique ont une fiabilite de seulement 20 %.