非标称状态下电力系统状态的直接和间接测量

Dhruba Kumar, Nada Ali
{"title":"非标称状态下电力系统状态的直接和间接测量","authors":"Dhruba Kumar, Nada Ali","doi":"10.1109/CIEC.2016.7513739","DOIUrl":null,"url":null,"abstract":"Wide area measurement is significant for modernized control of power system. Phasor measurement unit (PMU) being the prime element for wide area measurement system (WAMS), it provides proper feedback to the closed looped controller to take proper steps during power system transients. This paper aims to measure the state of six bus power system in off-nominal frequency condition. To achieve this firstly a three phase PMU is simulated using recursive algorithm and then the algorithm is made frequency adaptive by re-sampling. Pseudo measurement using ABCD parameter is also proposed and implemented.","PeriodicalId":443343,"journal":{"name":"2016 2nd International Conference on Control, Instrumentation, Energy & Communication (CIEC)","volume":"28 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Direct and indirect measurements of power system states in off-nominal condition\",\"authors\":\"Dhruba Kumar, Nada Ali\",\"doi\":\"10.1109/CIEC.2016.7513739\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Wide area measurement is significant for modernized control of power system. Phasor measurement unit (PMU) being the prime element for wide area measurement system (WAMS), it provides proper feedback to the closed looped controller to take proper steps during power system transients. This paper aims to measure the state of six bus power system in off-nominal frequency condition. To achieve this firstly a three phase PMU is simulated using recursive algorithm and then the algorithm is made frequency adaptive by re-sampling. Pseudo measurement using ABCD parameter is also proposed and implemented.\",\"PeriodicalId\":443343,\"journal\":{\"name\":\"2016 2nd International Conference on Control, Instrumentation, Energy & Communication (CIEC)\",\"volume\":\"28 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2016 2nd International Conference on Control, Instrumentation, Energy & Communication (CIEC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CIEC.2016.7513739\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 2nd International Conference on Control, Instrumentation, Energy & Communication (CIEC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CIEC.2016.7513739","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

摘要

广域测量对电力系统的现代化控制具有重要意义。相量测量单元(PMU)是广域测量系统(WAMS)的重要组成部分,它向闭环控制器提供适当的反馈,以便在电力系统暂态过程中采取适当的措施。本文旨在测量六母线电力系统在非标称频率工况下的状态。为了实现这一目标,首先采用递归算法对三相PMU进行了仿真,然后通过重采样实现了算法的频率自适应。提出并实现了基于ABCD参数的伪测量。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Direct and indirect measurements of power system states in off-nominal condition
Wide area measurement is significant for modernized control of power system. Phasor measurement unit (PMU) being the prime element for wide area measurement system (WAMS), it provides proper feedback to the closed looped controller to take proper steps during power system transients. This paper aims to measure the state of six bus power system in off-nominal frequency condition. To achieve this firstly a three phase PMU is simulated using recursive algorithm and then the algorithm is made frequency adaptive by re-sampling. Pseudo measurement using ABCD parameter is also proposed and implemented.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Design methodology, control and performance of a three-phase grid-tie PV inverter under maximum power point tracking An improved performance of the soft switching buck converter Multi-objective function for system modeling and optimal management of Micro grid: A hybrid technique A single-phase isolated Z-source inverter Three phase three switch modular Vienna, Boost and SEPIC rectifiers
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1