A. Agosti, S. Utili, D. Gregory, A. Lapworth, J. Samardzic, A. Prawasono
{"title":"露天矿矿井壁剖面优化设计","authors":"A. Agosti, S. Utili, D. Gregory, A. Lapworth, J. Samardzic, A. Prawasono","doi":"10.1080/19236026.2021.1979382","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":197002,"journal":{"name":"CIM Journal","volume":"15 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-11-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Design of an open-pit gold mine by optimal pitwall profiles\",\"authors\":\"A. Agosti, S. Utili, D. Gregory, A. Lapworth, J. Samardzic, A. Prawasono\",\"doi\":\"10.1080/19236026.2021.1979382\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":197002,\"journal\":{\"name\":\"CIM Journal\",\"volume\":\"15 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-11-26\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"CIM Journal\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1080/19236026.2021.1979382\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"CIM Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/19236026.2021.1979382","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}