{"title":"PT. X .高质量工作人员负荷评估与抽样工作方法","authors":"M. Taruna","doi":"10.25170/METRIS.V22I01.2670","DOIUrl":null,"url":null,"abstract":"This study aimed to determine the workload of the workers to be used for incentive plan in the Quality Control Division, Company X. Studying work characteristics, a work sampling technique was used. Two workers from this QC division were participated in the study. A number of 440 observation were taken from each Worker 1 and Worker 2. Results showed that the percentages of productive time are 93.62% for Worker 1 and 91.81% for Worker 2. Meanwhile for workload resulted 151% and 138% for Worker 1 and Worker 2 (classified as overload for both workers). This study recommended the company to add one more worker to help in this workstation to reduce the workload of these two workers","PeriodicalId":402087,"journal":{"name":"Jurnal METRIS","volume":"9 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-08-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Evaluasi Beban Kerja Pekerja Divisi Quality Control PT. X dengan Metode Work Sampling\",\"authors\":\"M. Taruna\",\"doi\":\"10.25170/METRIS.V22I01.2670\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This study aimed to determine the workload of the workers to be used for incentive plan in the Quality Control Division, Company X. Studying work characteristics, a work sampling technique was used. Two workers from this QC division were participated in the study. A number of 440 observation were taken from each Worker 1 and Worker 2. Results showed that the percentages of productive time are 93.62% for Worker 1 and 91.81% for Worker 2. Meanwhile for workload resulted 151% and 138% for Worker 1 and Worker 2 (classified as overload for both workers). This study recommended the company to add one more worker to help in this workstation to reduce the workload of these two workers\",\"PeriodicalId\":402087,\"journal\":{\"name\":\"Jurnal METRIS\",\"volume\":\"9 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-08-11\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal METRIS\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.25170/METRIS.V22I01.2670\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal METRIS","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.25170/METRIS.V22I01.2670","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Evaluasi Beban Kerja Pekerja Divisi Quality Control PT. X dengan Metode Work Sampling
This study aimed to determine the workload of the workers to be used for incentive plan in the Quality Control Division, Company X. Studying work characteristics, a work sampling technique was used. Two workers from this QC division were participated in the study. A number of 440 observation were taken from each Worker 1 and Worker 2. Results showed that the percentages of productive time are 93.62% for Worker 1 and 91.81% for Worker 2. Meanwhile for workload resulted 151% and 138% for Worker 1 and Worker 2 (classified as overload for both workers). This study recommended the company to add one more worker to help in this workstation to reduce the workload of these two workers