T. Babnik, U. Gabrijel, B. Mahkovec, M. Perko, G. Sitar
{"title":"广域测量系统的应用","authors":"T. Babnik, U. Gabrijel, B. Mahkovec, M. Perko, G. Sitar","doi":"10.1109/PCT.2007.4538562","DOIUrl":null,"url":null,"abstract":"This paper presents functionality of developed wide area monitoring system (WAMS) and its implementation in Slovenian transmission system. The system enables real-time exchange of selected phasors between transmission system operators. Additionally, recordings captured on November 4th 2006, when the UCTE interconnected grid split into three areas are presented and discussed. At the end some indications of possible future development of wide area protection and control system are given.","PeriodicalId":356805,"journal":{"name":"2007 IEEE Lausanne Power Tech","volume":"48 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2007-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"16","resultStr":"{\"title\":\"Wide Area Measurement System in Action\",\"authors\":\"T. Babnik, U. Gabrijel, B. Mahkovec, M. Perko, G. Sitar\",\"doi\":\"10.1109/PCT.2007.4538562\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper presents functionality of developed wide area monitoring system (WAMS) and its implementation in Slovenian transmission system. The system enables real-time exchange of selected phasors between transmission system operators. Additionally, recordings captured on November 4th 2006, when the UCTE interconnected grid split into three areas are presented and discussed. At the end some indications of possible future development of wide area protection and control system are given.\",\"PeriodicalId\":356805,\"journal\":{\"name\":\"2007 IEEE Lausanne Power Tech\",\"volume\":\"48 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2007-07-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"16\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2007 IEEE Lausanne Power Tech\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PCT.2007.4538562\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2007 IEEE Lausanne Power Tech","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PCT.2007.4538562","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
This paper presents functionality of developed wide area monitoring system (WAMS) and its implementation in Slovenian transmission system. The system enables real-time exchange of selected phasors between transmission system operators. Additionally, recordings captured on November 4th 2006, when the UCTE interconnected grid split into three areas are presented and discussed. At the end some indications of possible future development of wide area protection and control system are given.