{"title":"考虑分布式发电机互联的快速配电潮流实用设备模型","authors":"S. Naka, T. Genji, Y. Fukuyama","doi":"10.1109/PESS.2001.970196","DOIUrl":null,"url":null,"abstract":"This paper presents distribution system equipment models for fast distribution load flow calculation considering interconnection of distributed generators. Recently, the number of distributed generators introduced into distribution systems has been increasing, and detailed system analysis using load flow calculation has been eagerly awaited. This paper develops practical equipment models such as various distributed generators, voltage control equipment, and loads. The feasibility of the developed models is verified and demonstrated on practical distribution system models with promising results.","PeriodicalId":273578,"journal":{"name":"2001 Power Engineering Society Summer Meeting. Conference Proceedings (Cat. No.01CH37262)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2001-07-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"60","resultStr":"{\"title\":\"Practical equipment models for fast distribution power flow considering interconnection of distributed generators\",\"authors\":\"S. Naka, T. Genji, Y. Fukuyama\",\"doi\":\"10.1109/PESS.2001.970196\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper presents distribution system equipment models for fast distribution load flow calculation considering interconnection of distributed generators. Recently, the number of distributed generators introduced into distribution systems has been increasing, and detailed system analysis using load flow calculation has been eagerly awaited. This paper develops practical equipment models such as various distributed generators, voltage control equipment, and loads. The feasibility of the developed models is verified and demonstrated on practical distribution system models with promising results.\",\"PeriodicalId\":273578,\"journal\":{\"name\":\"2001 Power Engineering Society Summer Meeting. Conference Proceedings (Cat. No.01CH37262)\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2001-07-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"60\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2001 Power Engineering Society Summer Meeting. Conference Proceedings (Cat. No.01CH37262)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PESS.2001.970196\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2001 Power Engineering Society Summer Meeting. Conference Proceedings (Cat. No.01CH37262)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PESS.2001.970196","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Practical equipment models for fast distribution power flow considering interconnection of distributed generators
This paper presents distribution system equipment models for fast distribution load flow calculation considering interconnection of distributed generators. Recently, the number of distributed generators introduced into distribution systems has been increasing, and detailed system analysis using load flow calculation has been eagerly awaited. This paper develops practical equipment models such as various distributed generators, voltage control equipment, and loads. The feasibility of the developed models is verified and demonstrated on practical distribution system models with promising results.