{"title":"考虑分布式发电机互联的快速配电潮流实用设备模型","authors":"S. Naka, T. Genji, Y. Fukuyama","doi":"10.1109/PESS.2001.970196","DOIUrl":null,"url":null,"abstract":"This paper presents distribution system equipment models for fast distribution load flow calculation considering interconnection of distributed generators. Recently, the number of distributed generators introduced into distribution systems has been increasing, and detailed system analysis using load flow calculation has been eagerly awaited. This paper develops practical equipment models such as various distributed generators, voltage control equipment, and loads. The feasibility of the developed models is verified and demonstrated on practical distribution system models with promising results.","PeriodicalId":273578,"journal":{"name":"2001 Power Engineering Society Summer Meeting. Conference Proceedings (Cat. No.01CH37262)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2001-07-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"60","resultStr":"{\"title\":\"Practical equipment models for fast distribution power flow considering interconnection of distributed generators\",\"authors\":\"S. Naka, T. Genji, Y. Fukuyama\",\"doi\":\"10.1109/PESS.2001.970196\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper presents distribution system equipment models for fast distribution load flow calculation considering interconnection of distributed generators. Recently, the number of distributed generators introduced into distribution systems has been increasing, and detailed system analysis using load flow calculation has been eagerly awaited. This paper develops practical equipment models such as various distributed generators, voltage control equipment, and loads. The feasibility of the developed models is verified and demonstrated on practical distribution system models with promising results.\",\"PeriodicalId\":273578,\"journal\":{\"name\":\"2001 Power Engineering Society Summer Meeting. Conference Proceedings (Cat. No.01CH37262)\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2001-07-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"60\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2001 Power Engineering Society Summer Meeting. Conference Proceedings (Cat. No.01CH37262)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PESS.2001.970196\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2001 Power Engineering Society Summer Meeting. Conference Proceedings (Cat. No.01CH37262)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PESS.2001.970196","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 60

摘要

提出了考虑分布式发电机组并网的配电系统设备快速配电网潮流计算模型。近年来,引入配电系统的分布式发电机组数量不断增加,人们迫切需要对其进行详细的负荷潮流分析。本文开发了各种分布式发电机、电压控制设备和负载等实用设备模型。在实际的配电网模型上验证了所建模型的可行性,并取得了良好的结果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Practical equipment models for fast distribution power flow considering interconnection of distributed generators
This paper presents distribution system equipment models for fast distribution load flow calculation considering interconnection of distributed generators. Recently, the number of distributed generators introduced into distribution systems has been increasing, and detailed system analysis using load flow calculation has been eagerly awaited. This paper develops practical equipment models such as various distributed generators, voltage control equipment, and loads. The feasibility of the developed models is verified and demonstrated on practical distribution system models with promising results.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
A reliability insurance scheme for the electricity distribution grid The surrogate worth trade off analysis for power system operation in electricity markets Feasibility of a DC intertie for Sitka-Kake-Petersburg interconnection Parameters that influence power quality on industrial frequency AC traction systems Evaluation of retail electricity supply contracts in deregulated environment
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1