双三相转六相输电线路故障分析

Mohd Wazir Mustafa, M. R. Ahmad, Hussain Shareef
{"title":"双三相转六相输电线路故障分析","authors":"Mohd Wazir Mustafa, M. R. Ahmad, Hussain Shareef","doi":"10.1109/IPEC.2005.207059","DOIUrl":null,"url":null,"abstract":"High phase order transmission system is being considered a viable alternative for increasing the power transmission capability of overhead electric power transmission over existing right-of-way. This paper presents the faults analysis of six-phase transmission system. In this context, fault analysis has been conducted on the Goudey-Oakdale 2-bus test system. The results of these investigations are presented in the form of typical time responses. The PSCAD/EMTDC is used for the simulation studies","PeriodicalId":164802,"journal":{"name":"2005 International Power Engineering Conference","volume":"38 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2005-11-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"22","resultStr":"{\"title\":\"Fault analysis on double three-phase to six-phase converted transmission line\",\"authors\":\"Mohd Wazir Mustafa, M. R. Ahmad, Hussain Shareef\",\"doi\":\"10.1109/IPEC.2005.207059\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"High phase order transmission system is being considered a viable alternative for increasing the power transmission capability of overhead electric power transmission over existing right-of-way. This paper presents the faults analysis of six-phase transmission system. In this context, fault analysis has been conducted on the Goudey-Oakdale 2-bus test system. The results of these investigations are presented in the form of typical time responses. The PSCAD/EMTDC is used for the simulation studies\",\"PeriodicalId\":164802,\"journal\":{\"name\":\"2005 International Power Engineering Conference\",\"volume\":\"38 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2005-11-29\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"22\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2005 International Power Engineering Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IPEC.2005.207059\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2005 International Power Engineering Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IPEC.2005.207059","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 22

摘要

高相序输电系统被认为是在现有路权基础上提高架空输电输电能力的可行选择。本文介绍了六相输电系统的故障分析。在此背景下,对Goudey-Oakdale双母线测试系统进行了故障分析。这些研究的结果以典型时间响应的形式呈现。采用PSCAD/EMTDC进行仿真研究
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Fault analysis on double three-phase to six-phase converted transmission line
High phase order transmission system is being considered a viable alternative for increasing the power transmission capability of overhead electric power transmission over existing right-of-way. This paper presents the faults analysis of six-phase transmission system. In this context, fault analysis has been conducted on the Goudey-Oakdale 2-bus test system. The results of these investigations are presented in the form of typical time responses. The PSCAD/EMTDC is used for the simulation studies
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
The application of association rule mining in power system restoration The influence of model mismatch to power system calculation, part II: on the stability calculation Optimal participation of a microgrid to the energy market with an intelligent EMS An account of a modified lightning protection system for power stations An improved usage allocation method for deregulated transmission systems
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1