光伏大渗透配电系统电压控制中的热泵热水器计划运行

A. L. M. Mufaris, J. Baba
{"title":"光伏大渗透配电系统电压控制中的热泵热水器计划运行","authors":"A. L. M. Mufaris, J. Baba","doi":"10.1109/GREENTECH.2013.21","DOIUrl":null,"url":null,"abstract":"It is expected that large capacity distributed generation (DG) systems including photovoltaic (PV) power systems will be installed in future power systems. When the capacity of PV power systems installed in the distribution system increases, voltage of the system goes beyond the allowable voltage range due to reverse power flow from PV power systems. In order to minimize this problem, load control at the customer end would be a possible solution. In this paper, application of controllable customer equipment, Heat Pump Water Heater (HPWH), has been proposed in order to mitigate voltage violation. The input power of HPWH is applied in three different ways: rated input, step input and multiple inputs so as to find the optimum solution that keeps the voltage within allowable limit.","PeriodicalId":311325,"journal":{"name":"2013 IEEE Green Technologies Conference (GreenTech)","volume":"21 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2013-04-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"10","resultStr":"{\"title\":\"Scheduled Operation of Heat Pump Water Heater for Voltage Control in Distribution System with Large Penetration of PV Systems\",\"authors\":\"A. L. M. Mufaris, J. Baba\",\"doi\":\"10.1109/GREENTECH.2013.21\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"It is expected that large capacity distributed generation (DG) systems including photovoltaic (PV) power systems will be installed in future power systems. When the capacity of PV power systems installed in the distribution system increases, voltage of the system goes beyond the allowable voltage range due to reverse power flow from PV power systems. In order to minimize this problem, load control at the customer end would be a possible solution. In this paper, application of controllable customer equipment, Heat Pump Water Heater (HPWH), has been proposed in order to mitigate voltage violation. The input power of HPWH is applied in three different ways: rated input, step input and multiple inputs so as to find the optimum solution that keeps the voltage within allowable limit.\",\"PeriodicalId\":311325,\"journal\":{\"name\":\"2013 IEEE Green Technologies Conference (GreenTech)\",\"volume\":\"21 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2013-04-04\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"10\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2013 IEEE Green Technologies Conference (GreenTech)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/GREENTECH.2013.21\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2013 IEEE Green Technologies Conference (GreenTech)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/GREENTECH.2013.21","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 10

摘要

预计未来的电力系统将安装包括光伏(PV)电力系统在内的大容量分布式发电(DG)系统。当配电系统中安装的光伏发电系统容量增加时,由于光伏发电系统的反向潮流,导致配电系统电压超出允许电压范围。为了尽量减少这个问题,在客户端进行负载控制将是一个可能的解决方案。本文提出了采用可控客户设备——热泵热水器(HPWH)来缓解电压违和。采用额定输入、阶跃输入和多路输入三种不同的方式施加高压pwh的输入功率,以找到使电压保持在允许范围内的最优解。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Scheduled Operation of Heat Pump Water Heater for Voltage Control in Distribution System with Large Penetration of PV Systems
It is expected that large capacity distributed generation (DG) systems including photovoltaic (PV) power systems will be installed in future power systems. When the capacity of PV power systems installed in the distribution system increases, voltage of the system goes beyond the allowable voltage range due to reverse power flow from PV power systems. In order to minimize this problem, load control at the customer end would be a possible solution. In this paper, application of controllable customer equipment, Heat Pump Water Heater (HPWH), has been proposed in order to mitigate voltage violation. The input power of HPWH is applied in three different ways: rated input, step input and multiple inputs so as to find the optimum solution that keeps the voltage within allowable limit.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Micro Behavior Information Decision Research in An ABM Traffic and Energy Model Using Electricity Market Analytics to Reduce Cost and Environmental Impact A New Class of Light-Traps for Nano-enhanced Photovoltaic Conversion Modeling DFIG Using General Vector Representation in the Presence of Harmonics A Linear Programming Methodology to Quantify the Impact of PHEVs with V2G Capabilities on Distribution Systems
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1