{"title":"初始系统对某医院供能系统更新规划的影响","authors":"S. Yoshida, Akira Yoshida, Koichi Ito, Y. Amano","doi":"10.1299/KIKAIB.79.2312","DOIUrl":null,"url":null,"abstract":"In this study, a renewal planning problem of energy supply system is formulated as a large scale mixed-integer linear programming problem, in which the objective function to the minimized is the average value of annual total cost during system’s evaluation period. By adopting the programming language AMPL and CPLEX solver, a numerical study is carried out for a hospital, where electrical(e.g., heat pump) and gas(e.g., gas engine cogeneration) systems are compared together with arbitrary combination one, which is composed of electrical and gas driven pieces of equipment, by focusing particularly on the influence of initial system’s difference. The main results obtained are as follows: (a) If the initial system is gas one, it is better to renew it to the electrical one as soon as possible due to relatively low energy efficiency of gas utilizing pieces of equipment, the high price of gas input energy and so on. (b) If the initial system is electrical one, the optimal renewal year becomes relatively later year, because it is economically better to use the initially installed high efficiency system as long as possible. (c) Theoretically, the arbitrary combination system is of course the best renewal one. However, there is no economic difference between the arbitrary combination system and the electrical one.","PeriodicalId":331123,"journal":{"name":"Transactions of the Japan Society of Mechanical Engineers. B","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2013-11-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Influence of Initial Systems on the Renewal Planning of Energy Supply Systems for a Hospital\",\"authors\":\"S. Yoshida, Akira Yoshida, Koichi Ito, Y. Amano\",\"doi\":\"10.1299/KIKAIB.79.2312\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this study, a renewal planning problem of energy supply system is formulated as a large scale mixed-integer linear programming problem, in which the objective function to the minimized is the average value of annual total cost during system’s evaluation period. By adopting the programming language AMPL and CPLEX solver, a numerical study is carried out for a hospital, where electrical(e.g., heat pump) and gas(e.g., gas engine cogeneration) systems are compared together with arbitrary combination one, which is composed of electrical and gas driven pieces of equipment, by focusing particularly on the influence of initial system’s difference. The main results obtained are as follows: (a) If the initial system is gas one, it is better to renew it to the electrical one as soon as possible due to relatively low energy efficiency of gas utilizing pieces of equipment, the high price of gas input energy and so on. (b) If the initial system is electrical one, the optimal renewal year becomes relatively later year, because it is economically better to use the initially installed high efficiency system as long as possible. (c) Theoretically, the arbitrary combination system is of course the best renewal one. However, there is no economic difference between the arbitrary combination system and the electrical one.\",\"PeriodicalId\":331123,\"journal\":{\"name\":\"Transactions of the Japan Society of Mechanical Engineers. B\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2013-11-18\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Transactions of the Japan Society of Mechanical Engineers. B\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1299/KIKAIB.79.2312\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Transactions of the Japan Society of Mechanical Engineers. B","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1299/KIKAIB.79.2312","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文将能源供应系统更新规划问题表述为一个大规模的混合整数线性规划问题,其目标函数为系统评估期内年总成本的平均值。采用编程语言AMPL和CPLEX求解器,对某医院电气设备(如:(如热泵)和天然气(如:通过特别关注初始系统差异的影响,将燃气发动机热电联产系统与由电气和燃气驱动设备组成的任意组合系统进行了比较。主要结果如下:(a)初始系统为燃气系统,由于燃气利用设备的能效相对较低,燃气输入能量价格较高等原因,宜尽快更新为电力系统。(b)如果初始系统是电气系统,最佳更新年份相对较晚,因为尽可能长时间使用初始安装的高效系统在经济上更好。(c)理论上,任意组合制度当然是最好的更新制度。然而,任意组合系统与电气组合系统在经济上没有区别。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Influence of Initial Systems on the Renewal Planning of Energy Supply Systems for a Hospital
In this study, a renewal planning problem of energy supply system is formulated as a large scale mixed-integer linear programming problem, in which the objective function to the minimized is the average value of annual total cost during system’s evaluation period. By adopting the programming language AMPL and CPLEX solver, a numerical study is carried out for a hospital, where electrical(e.g., heat pump) and gas(e.g., gas engine cogeneration) systems are compared together with arbitrary combination one, which is composed of electrical and gas driven pieces of equipment, by focusing particularly on the influence of initial system’s difference. The main results obtained are as follows: (a) If the initial system is gas one, it is better to renew it to the electrical one as soon as possible due to relatively low energy efficiency of gas utilizing pieces of equipment, the high price of gas input energy and so on. (b) If the initial system is electrical one, the optimal renewal year becomes relatively later year, because it is economically better to use the initially installed high efficiency system as long as possible. (c) Theoretically, the arbitrary combination system is of course the best renewal one. However, there is no economic difference between the arbitrary combination system and the electrical one.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
SSRT and fatigue crack growth properties of two types of high strength austenitic stainless steels in high pressure hydrogen gas Influence of Initial Systems on the Renewal Planning of Energy Supply Systems for a Hospital Fdtd analysis of nanoscale temperature distribution induced by near-Field photothermal effect A study on equivalence-ratio dependence of minimum ignition energy based on initial burning velocity An analysis of quantum effect on the p-V-T relation of cryogenic hydrogen using centroid molecular dynamics method
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1