A. Madureira, J. M. Santos, S. Gomes, Bruno Cunha, J. Pereira, I. Pereira
{"title":"制造紧急订单的重新调度:一种监督学习方法","authors":"A. Madureira, J. M. Santos, S. Gomes, Bruno Cunha, J. Pereira, I. Pereira","doi":"10.1109/NaBIC.2014.6921895","DOIUrl":null,"url":null,"abstract":"Contemporary manufacturing scheduling has still limitations in real-world environments where disturbances on working conditions could occur over time. Therefore, human intervention is required to maintain real-time adaptation and optimization and efficiently adapt to the inherent dynamic of markets. This paper addresses the problem of incorporating rush orders into the current schedule of a manufacturing shop floor organization. A set of experiments were performed in order to evaluate the applicability of supervised classification algorithms in the attempt to predict the best integration mechanism when receiving a new order in a dynamic scheduling problem.","PeriodicalId":209716,"journal":{"name":"2014 Sixth World Congress on Nature and Biologically Inspired Computing (NaBIC 2014)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2014-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":"{\"title\":\"Manufacturing rush orders rescheduling: a supervised learning approach\",\"authors\":\"A. Madureira, J. M. Santos, S. Gomes, Bruno Cunha, J. Pereira, I. Pereira\",\"doi\":\"10.1109/NaBIC.2014.6921895\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Contemporary manufacturing scheduling has still limitations in real-world environments where disturbances on working conditions could occur over time. Therefore, human intervention is required to maintain real-time adaptation and optimization and efficiently adapt to the inherent dynamic of markets. This paper addresses the problem of incorporating rush orders into the current schedule of a manufacturing shop floor organization. A set of experiments were performed in order to evaluate the applicability of supervised classification algorithms in the attempt to predict the best integration mechanism when receiving a new order in a dynamic scheduling problem.\",\"PeriodicalId\":209716,\"journal\":{\"name\":\"2014 Sixth World Congress on Nature and Biologically Inspired Computing (NaBIC 2014)\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-07-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"6\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2014 Sixth World Congress on Nature and Biologically Inspired Computing (NaBIC 2014)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/NaBIC.2014.6921895\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 Sixth World Congress on Nature and Biologically Inspired Computing (NaBIC 2014)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/NaBIC.2014.6921895","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Manufacturing rush orders rescheduling: a supervised learning approach
Contemporary manufacturing scheduling has still limitations in real-world environments where disturbances on working conditions could occur over time. Therefore, human intervention is required to maintain real-time adaptation and optimization and efficiently adapt to the inherent dynamic of markets. This paper addresses the problem of incorporating rush orders into the current schedule of a manufacturing shop floor organization. A set of experiments were performed in order to evaluate the applicability of supervised classification algorithms in the attempt to predict the best integration mechanism when receiving a new order in a dynamic scheduling problem.