{"title":"确定性断封分析在断陷圈闭中的应用——以越南南海南con Son盆地05-1(a)区块Than Nong 1B远景区为例","authors":"Anh T. Truong, Tam T. Le, N. D. Dang, T. Do, Lap Quoc Lai, Lan Nguyen","doi":"10.46326/jmes.2023.64(1).04","DOIUrl":null,"url":null,"abstract":"Fault-seal analysis has long been applied for predicting potential hydrocarbon column for mitigating risk in exploration and appraisals. Than Nong 1B structure in Block 05-1(a), located nearby Dai Hung field, is a fault-bounding structure; thus, the fault seal capacity plays a major role in trapping hydrocarbon. In this study, the H50 reservoir is taken as an example of how fault-bounded prospects are evaluated in Block 05-1(a). For the case of Than Nong 1B, to meaningfully determine the potential of the structure, the fault geometric analysis is conducted to fully understand the 3D geometry of the structure. Moreover, vertical displacement of the faults is inspected to ensure the quality of input data and to understand how faults and horizons affect each other. After structural description conducted, the study applies all common methods of fault-seal analysis from the 1980s to the newest workflow published in 2016, such as 3D sand-shale juxtaposition analysis, SGR analysis, height-column-prediction algorithms by Yielding et al. (2010). The results of these methods are then combined by using Trap analysis workflow, proposed by Peter Bretan in 2017, to determine a unique location of fault leak point defining the trappable hydrocarbon column of the structure. The results suggest that the faults in Than Nong 1B prospect are able to hold a maximum column of 183 m hydrocarbon in H50 reservoir, significantly higher than the column of 125 m hydrocarbon defined by Fault-leak point. Furthermore, this study also proves that the Trap analysis is an effective method for evaluating structures with high level of fault linkage.","PeriodicalId":170167,"journal":{"name":"Journal of Mining and Earth Sciences","volume":"132 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-02-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Application of deterministic fault-seal analysis for fault-bounding trap: a case study in Than Nong 1B prospect, Block 05-1(a), Nam Con Son basin, offshore Vietnam\",\"authors\":\"Anh T. Truong, Tam T. Le, N. D. Dang, T. Do, Lap Quoc Lai, Lan Nguyen\",\"doi\":\"10.46326/jmes.2023.64(1).04\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Fault-seal analysis has long been applied for predicting potential hydrocarbon column for mitigating risk in exploration and appraisals. Than Nong 1B structure in Block 05-1(a), located nearby Dai Hung field, is a fault-bounding structure; thus, the fault seal capacity plays a major role in trapping hydrocarbon. In this study, the H50 reservoir is taken as an example of how fault-bounded prospects are evaluated in Block 05-1(a). For the case of Than Nong 1B, to meaningfully determine the potential of the structure, the fault geometric analysis is conducted to fully understand the 3D geometry of the structure. Moreover, vertical displacement of the faults is inspected to ensure the quality of input data and to understand how faults and horizons affect each other. After structural description conducted, the study applies all common methods of fault-seal analysis from the 1980s to the newest workflow published in 2016, such as 3D sand-shale juxtaposition analysis, SGR analysis, height-column-prediction algorithms by Yielding et al. (2010). The results of these methods are then combined by using Trap analysis workflow, proposed by Peter Bretan in 2017, to determine a unique location of fault leak point defining the trappable hydrocarbon column of the structure. The results suggest that the faults in Than Nong 1B prospect are able to hold a maximum column of 183 m hydrocarbon in H50 reservoir, significantly higher than the column of 125 m hydrocarbon defined by Fault-leak point. Furthermore, this study also proves that the Trap analysis is an effective method for evaluating structures with high level of fault linkage.\",\"PeriodicalId\":170167,\"journal\":{\"name\":\"Journal of Mining and Earth Sciences\",\"volume\":\"132 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-02-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Mining and Earth Sciences\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.46326/jmes.2023.64(1).04\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Mining and Earth Sciences","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.46326/jmes.2023.64(1).04","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

断层封闭性分析长期以来被用于预测潜在油气柱,以降低勘探和评价的风险。05-1(a)区块丹农1B构造位于大红油田附近,为断陷构造;因此,断层封闭性在油气圈闭中起着重要作用。本研究以H50储层为例,对05-1区块(a)断层界远景进行了评价。以丹农1B为例,为了有意义地确定构造的潜力,进行了断层几何分析,以充分了解构造的三维几何形状。此外,还检查了断层的垂直位移,以确保输入数据的质量,并了解断层和层位之间的相互影响。在完成构造描述后,本研究将20世纪80年代以来断层封闭性分析的常用方法全部应用到2016年发布的最新工作流程中,如三维砂页岩并并分析、SGR分析、yield等(2010)的高度柱预测算法等。然后将这些方法的结果与Peter Bretan在2017年提出的圈闭分析工作流程相结合,以确定一个独特的断层泄漏点位置,定义该结构的可圈闭油气柱。结果表明,丹农1B探井断层在H50储层中最大能容纳183 m油气,明显高于断层漏点定义的125 m油气。此外,本研究还证明了圈闭分析是评价断层联动程度高的构造的有效方法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Application of deterministic fault-seal analysis for fault-bounding trap: a case study in Than Nong 1B prospect, Block 05-1(a), Nam Con Son basin, offshore Vietnam
Fault-seal analysis has long been applied for predicting potential hydrocarbon column for mitigating risk in exploration and appraisals. Than Nong 1B structure in Block 05-1(a), located nearby Dai Hung field, is a fault-bounding structure; thus, the fault seal capacity plays a major role in trapping hydrocarbon. In this study, the H50 reservoir is taken as an example of how fault-bounded prospects are evaluated in Block 05-1(a). For the case of Than Nong 1B, to meaningfully determine the potential of the structure, the fault geometric analysis is conducted to fully understand the 3D geometry of the structure. Moreover, vertical displacement of the faults is inspected to ensure the quality of input data and to understand how faults and horizons affect each other. After structural description conducted, the study applies all common methods of fault-seal analysis from the 1980s to the newest workflow published in 2016, such as 3D sand-shale juxtaposition analysis, SGR analysis, height-column-prediction algorithms by Yielding et al. (2010). The results of these methods are then combined by using Trap analysis workflow, proposed by Peter Bretan in 2017, to determine a unique location of fault leak point defining the trappable hydrocarbon column of the structure. The results suggest that the faults in Than Nong 1B prospect are able to hold a maximum column of 183 m hydrocarbon in H50 reservoir, significantly higher than the column of 125 m hydrocarbon defined by Fault-leak point. Furthermore, this study also proves that the Trap analysis is an effective method for evaluating structures with high level of fault linkage.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
ESP Application for Oil Production in Naturally Fractured Granitic Basement Reservoir Comparison analytical hierarchy process (AHP) and frequency ratio (FR) method in assessment of landslide susceptibility. A case study in Van Yen district, Yen Bai province Deep geological structure of An Chau trough base on new study data Assessment of liquefaction potential of sand distributed in the 1 District, Ho Chi Minh city Geotechnical zoning in Hai Duong province for construction planning
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1