计划使用起重机来建造贝丝泗水大厦的公寓建筑项目

Nachda Nur Mahdiyah, Dyah Lidyaningtias, Susapto Susapto
{"title":"计划使用起重机来建造贝丝泗水大厦的公寓建筑项目","authors":"Nachda Nur Mahdiyah, Dyah Lidyaningtias, Susapto Susapto","doi":"10.55404/jos-mrk.2021.02.03.202-209","DOIUrl":null,"url":null,"abstract":"The BeSS Mansion Sarabaya apartment building is a construction project with a total building area of 86,000 m2. This apartment complex, which is located in the centre of Surabaya, includes 44 stories of Tower Premiere, 42 stories of Tower Suite, and 9 stories of Tower Podium parking area. Tower Cranes are used to transport or move materials in the construction of high-rise buildings. The objective of this thesis analysis is to figure out how many Tower Cranes are needed, as well as scheduling, operational costs, site layout, traffic management, and the HIRARC matrix. The data used were shop drawings, Tower crane specifications, and Tower Crane rental prices. According to the results of this calculating plan, two units of Tower Cranes are required to complete structural work, with a total work time of 5,592 hours. Tower Crane type MCT 205 requires a rental cost of Rp. 844,266,37 per hour, whereas Tower Crane type Tengda TC 6018 requires a rental charge of Rp. 701.184.89 per hour. On the site layout study, there are four options, and option 2 has been chosen because it is close to 0 or the minimum value, and traffic management planning uses an one gate system.","PeriodicalId":337938,"journal":{"name":"Jurnal JOS-MRK","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-09-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"PERENCANAA PENGGUNAAN TOWER CRANE UNTUK PEKERJAAN STRUKTUR PROYEK APARTEMEN BESS MANSION SURABAYA\",\"authors\":\"Nachda Nur Mahdiyah, Dyah Lidyaningtias, Susapto Susapto\",\"doi\":\"10.55404/jos-mrk.2021.02.03.202-209\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The BeSS Mansion Sarabaya apartment building is a construction project with a total building area of 86,000 m2. This apartment complex, which is located in the centre of Surabaya, includes 44 stories of Tower Premiere, 42 stories of Tower Suite, and 9 stories of Tower Podium parking area. Tower Cranes are used to transport or move materials in the construction of high-rise buildings. The objective of this thesis analysis is to figure out how many Tower Cranes are needed, as well as scheduling, operational costs, site layout, traffic management, and the HIRARC matrix. The data used were shop drawings, Tower crane specifications, and Tower Crane rental prices. According to the results of this calculating plan, two units of Tower Cranes are required to complete structural work, with a total work time of 5,592 hours. Tower Crane type MCT 205 requires a rental cost of Rp. 844,266,37 per hour, whereas Tower Crane type Tengda TC 6018 requires a rental charge of Rp. 701.184.89 per hour. On the site layout study, there are four options, and option 2 has been chosen because it is close to 0 or the minimum value, and traffic management planning uses an one gate system.\",\"PeriodicalId\":337938,\"journal\":{\"name\":\"Jurnal JOS-MRK\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-09-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal JOS-MRK\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.55404/jos-mrk.2021.02.03.202-209\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal JOS-MRK","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.55404/jos-mrk.2021.02.03.202-209","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

BeSS大厦Sarabaya公寓楼是一个总建筑面积8.6万平方米的建设项目。这座公寓大楼位于泗水市中心,包括44层的Tower Premiere, 42层的Tower Suite和9层的Tower Podium停车场。塔式起重机在高层建筑施工中用于运输或移动材料。本文分析的目的是计算出需要多少台塔式起重机,以及调度、运营成本、场地布局、交通管理和HIRARC矩阵。使用的数据是车间图纸,塔机规格,塔机租赁价格。根据本计算方案计算结果,完成结构工作需要两台塔机,总工作时间5592小时。MCT 205型塔式起重机的租金为每小时844,266,37卢比,而腾达TC 6018型塔式起重机的租金为每小时701.184.89卢比。在场地布局研究中,有四种方案,选择方案2,因为它接近于0或最小值,交通管理规划采用一门制。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
PERENCANAA PENGGUNAAN TOWER CRANE UNTUK PEKERJAAN STRUKTUR PROYEK APARTEMEN BESS MANSION SURABAYA
The BeSS Mansion Sarabaya apartment building is a construction project with a total building area of 86,000 m2. This apartment complex, which is located in the centre of Surabaya, includes 44 stories of Tower Premiere, 42 stories of Tower Suite, and 9 stories of Tower Podium parking area. Tower Cranes are used to transport or move materials in the construction of high-rise buildings. The objective of this thesis analysis is to figure out how many Tower Cranes are needed, as well as scheduling, operational costs, site layout, traffic management, and the HIRARC matrix. The data used were shop drawings, Tower crane specifications, and Tower Crane rental prices. According to the results of this calculating plan, two units of Tower Cranes are required to complete structural work, with a total work time of 5,592 hours. Tower Crane type MCT 205 requires a rental cost of Rp. 844,266,37 per hour, whereas Tower Crane type Tengda TC 6018 requires a rental charge of Rp. 701.184.89 per hour. On the site layout study, there are four options, and option 2 has been chosen because it is close to 0 or the minimum value, and traffic management planning uses an one gate system.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
ANALISIS STABILITAS TUBUH BENDUNGAN PADA BENDUNGAN SEMANTOK KABUPATEN NGANJUK PROVINSI JAWA TIMUR ANALISA PERPANJANGAN LANDASAN PACU PADA BANDAR UDARA ABDULRACHMAN SALEH MALANG (STA 2+250 – STA 3+000) EVALUASI DAN PERENCANAAN ULANG SISTEM JARINGAN DRAINASE KECAMATAN KARTOHARJO KOTA MADIUN ANALISA KERUSAKAN JALAN MENGGUNAKAN METODE BINA MARGA PADA JALAN RAYA JERU – JALAN RAYA TUMPANG KABUPATEN MALANG PERENCANAAN ULANG STRUKTUR ATAS DAN RAB GEDUNG KULIAH AKN PUTRA SANG FAJAR
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1