软件质量保证的系统方法:项目生命周期和系统开发生命周期内项目活动的关系

W. Wong, Su Wen Yu, C. Too
{"title":"软件质量保证的系统方法:项目生命周期和系统开发生命周期内项目活动的关系","authors":"W. Wong, Su Wen Yu, C. Too","doi":"10.1109/SPC.2018.8703978","DOIUrl":null,"url":null,"abstract":"The process of software changes is complex and constantly needed to be monitored, controlled and tracked by a systematic approach or mechanism. For the past decades, organizations invested great amount of effort, money and resources in quality management system (QMS) to ensure software change control management (SCCM) and business operations are consistent, reliable and meeting customers’ needs. As such, it is important for every project team member to comply and adhere to change control standards following best practices maximizing business advantages, enhancing product quality, improving process routines and increases performance earnings. A formalized SCCM without compliance from project team is equivalence to \"procedure on paper\". This paper discusses the need of joined effort from both project manager and technical team in view of organizational level achievement in software quality assurance. At the same time, this paper provides a general overview of how software change control is carried out in the context of IT Project Management. A step-by-step project activity within system development life cycle (SDLC) and project life cycle (PLC) is discussed in the paper.","PeriodicalId":432464,"journal":{"name":"2018 IEEE Conference on Systems, Process and Control (ICSPC)","volume":"21 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":"{\"title\":\"A Systematic Approach to Software Quality Assurance: The Relationship of Project Activities within Project Life Cycle and System Development Life Cycle\",\"authors\":\"W. Wong, Su Wen Yu, C. Too\",\"doi\":\"10.1109/SPC.2018.8703978\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The process of software changes is complex and constantly needed to be monitored, controlled and tracked by a systematic approach or mechanism. For the past decades, organizations invested great amount of effort, money and resources in quality management system (QMS) to ensure software change control management (SCCM) and business operations are consistent, reliable and meeting customers’ needs. As such, it is important for every project team member to comply and adhere to change control standards following best practices maximizing business advantages, enhancing product quality, improving process routines and increases performance earnings. A formalized SCCM without compliance from project team is equivalence to \\\"procedure on paper\\\". This paper discusses the need of joined effort from both project manager and technical team in view of organizational level achievement in software quality assurance. At the same time, this paper provides a general overview of how software change control is carried out in the context of IT Project Management. A step-by-step project activity within system development life cycle (SDLC) and project life cycle (PLC) is discussed in the paper.\",\"PeriodicalId\":432464,\"journal\":{\"name\":\"2018 IEEE Conference on Systems, Process and Control (ICSPC)\",\"volume\":\"21 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"7\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2018 IEEE Conference on Systems, Process and Control (ICSPC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/SPC.2018.8703978\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 IEEE Conference on Systems, Process and Control (ICSPC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SPC.2018.8703978","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7

摘要

软件变更的过程是复杂的,并且需要通过系统的方法或机制不断地监视、控制和跟踪。在过去的几十年里,组织在质量管理系统(QMS)上投入了大量的精力、金钱和资源,以确保软件变更控制管理(SCCM)和业务操作是一致的、可靠的,并满足客户的需求。因此,对于每个项目团队成员来说,遵从并坚持变更控制标准是非常重要的,这些标准遵循最佳实践,最大限度地提高业务优势,增强产品质量,改进过程例程并增加绩效收益。没有项目团队遵从的正式SCCM等同于“纸上程序”。本文从软件质量保证的组织层面成就出发,讨论了项目经理和技术团队共同努力的必要性。同时,本文提供了在IT项目管理环境中如何执行软件变更控制的总体概述。本文讨论了系统开发生命周期(SDLC)和项目生命周期(PLC)中的分步项目活动。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
A Systematic Approach to Software Quality Assurance: The Relationship of Project Activities within Project Life Cycle and System Development Life Cycle
The process of software changes is complex and constantly needed to be monitored, controlled and tracked by a systematic approach or mechanism. For the past decades, organizations invested great amount of effort, money and resources in quality management system (QMS) to ensure software change control management (SCCM) and business operations are consistent, reliable and meeting customers’ needs. As such, it is important for every project team member to comply and adhere to change control standards following best practices maximizing business advantages, enhancing product quality, improving process routines and increases performance earnings. A formalized SCCM without compliance from project team is equivalence to "procedure on paper". This paper discusses the need of joined effort from both project manager and technical team in view of organizational level achievement in software quality assurance. At the same time, this paper provides a general overview of how software change control is carried out in the context of IT Project Management. A step-by-step project activity within system development life cycle (SDLC) and project life cycle (PLC) is discussed in the paper.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
The Effect of Foot Arch on Plantar Distribution During Running A Comparative Study of Valve Stiction Compensation: Knocker Based Methods Design and Implement SumoBot for Classroom Teaching Vibration Control of a Nonlinear Double-Pendulum Overhead Crane Using Feedforward Command Shaping Mother Wavelet Selection for Control Valve Leakage Detection using Acoustic Emission
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1