斋塔普尔核电站的电力成本

S. Raju, M. Ramana
{"title":"斋塔普尔核电站的电力成本","authors":"S. Raju, M. Ramana","doi":"10.2139/ssrn.2214293","DOIUrl":null,"url":null,"abstract":"The Indian Government has announced that it plans to purchase six European Pressurized Reactors (EPRs) for Jaitapur from the French company, Areva. No EPR is in commercial operation anywhere else in the world. Estimates of costs from plants under construction in Finland and France suggest that each unit may cost as much as Rs. 60,000 crores; at this price, six units will cost Rs. 3.6 lakh crores. We show that the expected starting tariff from these reactors, without including transmission and distribution costs, is likely to be around Rs. 14 per unit (kWh) of electricity. We point out that existing revenue model used by the Government already involves a large loss for the taxpayer. The Government may seek to make the tariff from Jaitapur competitive by increasing the scope and nature of these handouts.","PeriodicalId":277238,"journal":{"name":"Nuclear Energy (Sustainability) eJournal","volume":"74 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2013-02-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Cost of Electricity from the Jaitapur Nuclear Power Plant\",\"authors\":\"S. Raju, M. Ramana\",\"doi\":\"10.2139/ssrn.2214293\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The Indian Government has announced that it plans to purchase six European Pressurized Reactors (EPRs) for Jaitapur from the French company, Areva. No EPR is in commercial operation anywhere else in the world. Estimates of costs from plants under construction in Finland and France suggest that each unit may cost as much as Rs. 60,000 crores; at this price, six units will cost Rs. 3.6 lakh crores. We show that the expected starting tariff from these reactors, without including transmission and distribution costs, is likely to be around Rs. 14 per unit (kWh) of electricity. We point out that existing revenue model used by the Government already involves a large loss for the taxpayer. The Government may seek to make the tariff from Jaitapur competitive by increasing the scope and nature of these handouts.\",\"PeriodicalId\":277238,\"journal\":{\"name\":\"Nuclear Energy (Sustainability) eJournal\",\"volume\":\"74 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2013-02-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Nuclear Energy (Sustainability) eJournal\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2139/ssrn.2214293\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Nuclear Energy (Sustainability) eJournal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2139/ssrn.2214293","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

摘要

印度政府宣布,计划从法国阿海珐公司购买6座欧洲加压反应堆(epr)用于jaiitapur核电站。世界上其他任何地方都没有EPR投入商业运营。芬兰和法国在建核电站的成本估计表明,每台机组的成本可能高达60亿卢比;按照这个价格,6套将耗资36万亿卢比。我们表明,在不包括传输和分配成本的情况下,这些反应堆的预期启动电价可能在每千瓦时14卢比左右。我们指出,政府现有的收入模式已经给纳税人带来了巨大的损失。政府可以通过增加这些施舍的范围和性质,使斋拉普尔的关税具有竞争力。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Cost of Electricity from the Jaitapur Nuclear Power Plant
The Indian Government has announced that it plans to purchase six European Pressurized Reactors (EPRs) for Jaitapur from the French company, Areva. No EPR is in commercial operation anywhere else in the world. Estimates of costs from plants under construction in Finland and France suggest that each unit may cost as much as Rs. 60,000 crores; at this price, six units will cost Rs. 3.6 lakh crores. We show that the expected starting tariff from these reactors, without including transmission and distribution costs, is likely to be around Rs. 14 per unit (kWh) of electricity. We point out that existing revenue model used by the Government already involves a large loss for the taxpayer. The Government may seek to make the tariff from Jaitapur competitive by increasing the scope and nature of these handouts.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Interaction between an Electron and a Quark Down About the Triton Structure Techno-Economic Analysis Methods for Nuclear Power Plants Nuclear Chaos: The Exelon-PHI Merger and What it Means for Nuclear Power in the United States and the EPA's Carbon Emission Rules The Bataan Nuclear Power Plant in the Philippines: Lessons from a White Elephant Project
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1