{"title":"浅谈复合地基的处理","authors":"G. Jing","doi":"10.1109/ISDEA.2012.716","DOIUrl":null,"url":null,"abstract":"After the soft soil horizon have been disposed through cement injection pile, they change into non-uniform plastic or Uneven layer of solid, so they form into the formation of a composite foundation due to the composition of soil structure have changed. This essay proves the advantage of short time and the well-reinforce-effect good quality assurance through the success of the use of cement injection pile in Ashen-expressway project of bridge section, high fill, culvert base treatment in Henan Province.","PeriodicalId":267532,"journal":{"name":"2012 Second International Conference on Intelligent System Design and Engineering Application","volume":"36 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2012-01-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"On the Processing of Composite Foundation\",\"authors\":\"G. Jing\",\"doi\":\"10.1109/ISDEA.2012.716\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"After the soft soil horizon have been disposed through cement injection pile, they change into non-uniform plastic or Uneven layer of solid, so they form into the formation of a composite foundation due to the composition of soil structure have changed. This essay proves the advantage of short time and the well-reinforce-effect good quality assurance through the success of the use of cement injection pile in Ashen-expressway project of bridge section, high fill, culvert base treatment in Henan Province.\",\"PeriodicalId\":267532,\"journal\":{\"name\":\"2012 Second International Conference on Intelligent System Design and Engineering Application\",\"volume\":\"36 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2012-01-06\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2012 Second International Conference on Intelligent System Design and Engineering Application\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ISDEA.2012.716\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2012 Second International Conference on Intelligent System Design and Engineering Application","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISDEA.2012.716","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
After the soft soil horizon have been disposed through cement injection pile, they change into non-uniform plastic or Uneven layer of solid, so they form into the formation of a composite foundation due to the composition of soil structure have changed. This essay proves the advantage of short time and the well-reinforce-effect good quality assurance through the success of the use of cement injection pile in Ashen-expressway project of bridge section, high fill, culvert base treatment in Henan Province.