Mariana Wagner de Toledo Piza, Osmar Carvalho de Bueno, Francisco Blasi Toledo Piza
{"title":"研究和实施shp的过程,以及环境许可对企业家和当地社区之间沟通的重要性","authors":"Mariana Wagner de Toledo Piza, Osmar Carvalho de Bueno, Francisco Blasi Toledo Piza","doi":"10.17224/ENERGAGRIC.2019V34N01P94-104","DOIUrl":null,"url":null,"abstract":"O PROCESSO DE ESTUDO E IMPLANTAÇÃO DE PCHS E A IMPORTÂNCIA DO LICENCIAMENTO AMBIENTAL PARA A COMUNICAÇÃO ENTRE EMPREENDEDORES E COMUNIDADE LOCAL \n \nMARIANA WAGNER DE TOLEDO PIZA1; OSMAR DE CARVALHO BUENO2; FRANCISCO JOSÉ BLASI DE TOLEDO PIZA3 \n \n1Economia, Sociologia e Tecnologia, Universidade Estadual Paulista (Unesp), Faculdade de Ciências Agronômicas, Botucatu, R. José Barbosa de Barros, 1780, JardimParaíso, CEP: 18610-034, Botucatu, São Paulo, Brasil, marywagner.adm@gmail.com \n2Economia, Sociologia e Tecnologia, Universidade Estadual Paulista, Universidade Estadual Paulista (Unesp), Faculdade de Ciências Agronômicas, Botucatu, R. José Barbosa de Barros, 1780, JardimParaíso, CEP: 18610-034, Botucatu, São Paulo, Brasil, osmar.bueno@unesp.br \n3Engenharia de Produção, Faculdade Iteana de Botucatu, Av. Alcides Cagliari, 2601, Jardim Aeroporto, CEP: 18606-855, Botucatu, São Paulo, Brasil, franciscotoledopiza@gmail.com \n \nRESUMO: O trabalho objetivou apresentar o processo de estudo para implantação de Pequenas Centrais Hidrelétricas (PCHs), o momento em que a comunidade local participa deste processo e a importância de sua efetiva participação. Utilizou-se a realidade brasileira no que tange o estudo para implantação de PCHs, a legislação nacional e órgãos envolvidos no processo como: Agência Nacional de Energia Elétrica (ANEEL), Agência Nacional de Águas (ANA), Departamento de Água e Energia Elétrica (DAEE) e Companhia Ambiental do Estado de São Paulo (CETESB). O processo de estudo de um potencial hidráulico conta com cinco fases: Estimativa do Potencial Hidrelétrico; Inventário Hidrelétrico; Estudo de Viabilidade; Projeto Básico e Projeto Executivo. Em consonância a este processo é necessário realizar o Estudo de Impacto Ambiental (EIA) e o respectivo Relatório de Impacto Ambiental (Rima). Como ambiente de diálogo entre todos os atores envolvidos, o processo de licenciamento ambiental conta com as audiências públicas, nessas devem ocorrer trocas de informações e conhecimento das demandas dos diversos envolvidos, inclusive da comunidade local, sua efetiva participação é fundamental para a otimização o projeto nos âmbito socioambiental. \n \nPalavras-chaves: PCHs, licenciamento ambiental, comunicação. \n \nTHE SHPs STUDY AND IMPLEMENTATION PROCESS AND IMPORTANCE OF ENVIRONMENTAL LICENSING FOR COMMUNICATION BETWEEN ENTREPRENEURS AND LOCAL COMMUNITY \n \nABSTRACT: The aim of this paper was to present the process of study and implementation of Small Hydroelectric Power Plants (SHPs), local community participation and the importance of their effective participation. The Brazilian reality was used in the study for the implementation of SHPs, as well as, national legislation and public agencies involved in the process, such as: National Electricity Agency (ANEEL), National Water Agency (ANA), Department of Water and Electric Energy (DAEE) and Environmental Company of the State of São Paulo (CETESB). The process of hydraulic potential study has five stages: hydropower potential estimation; hydraulic inventory; viability study; basic project and executive project. It is also necessary to carry out the Environmental Impact Study (EIA) and Environmental Impact Report (RIMA). According to all the actors involved, the environmental licensing process relies on public hearings, where must occur change of information and knowledge stakeholders demands, including the local community, which effective participation is fundamental for the optimization of the project socio-environmental scope. Keywords: SHPs, environmental licensing, communication.","PeriodicalId":364600,"journal":{"name":"ENERGIA NA AGRICULTURA","volume":"35 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-03-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"O PROCESSO DE ESTUDO E IMPLANTAÇÃO DE PCHS E A IMPORTÂNCIA DO LICENCIAMENTO AMBIENTAL PARA A COMUNICAÇÃO ENTRE EMPREENDEDORES E COMUNIDADE LOCAL\",\"authors\":\"Mariana Wagner de Toledo Piza, Osmar Carvalho de Bueno, Francisco Blasi Toledo Piza\",\"doi\":\"10.17224/ENERGAGRIC.2019V34N01P94-104\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"O PROCESSO DE ESTUDO E IMPLANTAÇÃO DE PCHS E A IMPORTÂNCIA DO LICENCIAMENTO AMBIENTAL PARA A COMUNICAÇÃO ENTRE EMPREENDEDORES E COMUNIDADE LOCAL \\n \\nMARIANA WAGNER DE TOLEDO PIZA1; OSMAR DE CARVALHO BUENO2; FRANCISCO JOSÉ BLASI DE TOLEDO PIZA3 \\n \\n1Economia, Sociologia e Tecnologia, Universidade Estadual Paulista (Unesp), Faculdade de Ciências Agronômicas, Botucatu, R. José Barbosa de Barros, 1780, JardimParaíso, CEP: 18610-034, Botucatu, São Paulo, Brasil, marywagner.adm@gmail.com \\n2Economia, Sociologia e Tecnologia, Universidade Estadual Paulista, Universidade Estadual Paulista (Unesp), Faculdade de Ciências Agronômicas, Botucatu, R. José Barbosa de Barros, 1780, JardimParaíso, CEP: 18610-034, Botucatu, São Paulo, Brasil, osmar.bueno@unesp.br \\n3Engenharia de Produção, Faculdade Iteana de Botucatu, Av. Alcides Cagliari, 2601, Jardim Aeroporto, CEP: 18606-855, Botucatu, São Paulo, Brasil, franciscotoledopiza@gmail.com \\n \\nRESUMO: O trabalho objetivou apresentar o processo de estudo para implantação de Pequenas Centrais Hidrelétricas (PCHs), o momento em que a comunidade local participa deste processo e a importância de sua efetiva participação. Utilizou-se a realidade brasileira no que tange o estudo para implantação de PCHs, a legislação nacional e órgãos envolvidos no processo como: Agência Nacional de Energia Elétrica (ANEEL), Agência Nacional de Águas (ANA), Departamento de Água e Energia Elétrica (DAEE) e Companhia Ambiental do Estado de São Paulo (CETESB). O processo de estudo de um potencial hidráulico conta com cinco fases: Estimativa do Potencial Hidrelétrico; Inventário Hidrelétrico; Estudo de Viabilidade; Projeto Básico e Projeto Executivo. Em consonância a este processo é necessário realizar o Estudo de Impacto Ambiental (EIA) e o respectivo Relatório de Impacto Ambiental (Rima). Como ambiente de diálogo entre todos os atores envolvidos, o processo de licenciamento ambiental conta com as audiências públicas, nessas devem ocorrer trocas de informações e conhecimento das demandas dos diversos envolvidos, inclusive da comunidade local, sua efetiva participação é fundamental para a otimização o projeto nos âmbito socioambiental. \\n \\nPalavras-chaves: PCHs, licenciamento ambiental, comunicação. \\n \\nTHE SHPs STUDY AND IMPLEMENTATION PROCESS AND IMPORTANCE OF ENVIRONMENTAL LICENSING FOR COMMUNICATION BETWEEN ENTREPRENEURS AND LOCAL COMMUNITY \\n \\nABSTRACT: The aim of this paper was to present the process of study and implementation of Small Hydroelectric Power Plants (SHPs), local community participation and the importance of their effective participation. The Brazilian reality was used in the study for the implementation of SHPs, as well as, national legislation and public agencies involved in the process, such as: National Electricity Agency (ANEEL), National Water Agency (ANA), Department of Water and Electric Energy (DAEE) and Environmental Company of the State of São Paulo (CETESB). The process of hydraulic potential study has five stages: hydropower potential estimation; hydraulic inventory; viability study; basic project and executive project. It is also necessary to carry out the Environmental Impact Study (EIA) and Environmental Impact Report (RIMA). According to all the actors involved, the environmental licensing process relies on public hearings, where must occur change of information and knowledge stakeholders demands, including the local community, which effective participation is fundamental for the optimization of the project socio-environmental scope. Keywords: SHPs, environmental licensing, communication.\",\"PeriodicalId\":364600,\"journal\":{\"name\":\"ENERGIA NA AGRICULTURA\",\"volume\":\"35 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-03-27\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"ENERGIA NA AGRICULTURA\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.17224/ENERGAGRIC.2019V34N01P94-104\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"ENERGIA NA AGRICULTURA","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.17224/ENERGAGRIC.2019V34N01P94-104","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
摘要
PCHS的研究和实施过程以及环境许可对企业家和当地社区之间沟通的重要性MARIANA WAGNER DE TOLEDO PIZA1;OSMAR DE CARVALHO BUENO2;弗朗兹约瑟冰川。正如托莱多PIZA3 1、社会学和经济技术,圣保罗州立大学农业科学学院(流),时间,拉尔夫·优素福1780年•巴博萨,JardimParaíso,邮政编码:18610 -034,第二大经济体,巴西圣保罗,marywagner.adm@gmail.com,社会学和技术,圣保罗州立大学,圣保罗州立大学农业科学学院(流),时间,拉尔夫·优素福1780年•巴博萨,JardimParaíso,邮编:18610 - -034次,巴西圣保罗,osmar.bueno@unesp.br 3生产的工程大学Iteana时间,2601年西德斯卡利亚里,花园里机场大道-855,邮编:18606,时间,巴西圣保罗,franciscotoledopiza@gmail.com总结:安装工作提供研究部署过程的小水坝(PCHs),地方社区的参与这一过程的有效参与的重要性。在实施PCHs的研究中,我们使用了巴西的现实、国家立法和参与这一过程的机构,如国家电力能源机构(ANEEL)、国家水利局(ANA)、水和电力部门(DAEE)和sao保罗州环境公司(CETESB)。水力发电潜力的研究过程包括五个阶段:水力发电潜力的估计;水力发电潜力的估计;水力发电潜力的估计水电清单;可行性研究;基础项目和执行项目。根据这一过程,有必要进行环境影响评估(EIA)和相应的环境影响报告(EIA)。所有演员之间的对话环境,环境许可程序的公开听证会,这些必须交换信息和知识的要求,包括有关的各种有效的参与是社区中的社会和环境优化设计的基本框架。关键词:chs,环境许可,传播。SHPs研究和实现过程和环境许可是企业家之间交流的重要性和当地社区文摘:这个论文的目的是提出研究的过程和实现的小型Hydroelectric发电厂(SHPs),当地社区参与和有效参与的重要性。巴西现实是用于研究SHPs的实现,那么,国家立法和公共机构参与的过程,如:国家电力公司(ANEEL),国家水机构(ANA)、水和电力能源(DAEE)和环境公司圣保罗(CETESB)的状态。水力势研究过程分为五个阶段:水力势估计;液压库存;viability研究;他的父亲是一名律师,母亲是一名律师。还需要进行环境影响研究(EIA)和环境影响报告(RIMA)。根据所有相关行动者,环境许可过程与公开听证会有关,公开听证会必须满足包括当地社区在内的利益攸关方不断变化的信息和知识需求,而当地社区的有效参与对于优化项目的社会环境范围至关重要。关键词:SHPs,环境许可,沟通。
O PROCESSO DE ESTUDO E IMPLANTAÇÃO DE PCHS E A IMPORTÂNCIA DO LICENCIAMENTO AMBIENTAL PARA A COMUNICAÇÃO ENTRE EMPREENDEDORES E COMUNIDADE LOCAL
O PROCESSO DE ESTUDO E IMPLANTAÇÃO DE PCHS E A IMPORTÂNCIA DO LICENCIAMENTO AMBIENTAL PARA A COMUNICAÇÃO ENTRE EMPREENDEDORES E COMUNIDADE LOCAL
MARIANA WAGNER DE TOLEDO PIZA1; OSMAR DE CARVALHO BUENO2; FRANCISCO JOSÉ BLASI DE TOLEDO PIZA3
1Economia, Sociologia e Tecnologia, Universidade Estadual Paulista (Unesp), Faculdade de Ciências Agronômicas, Botucatu, R. José Barbosa de Barros, 1780, JardimParaíso, CEP: 18610-034, Botucatu, São Paulo, Brasil, marywagner.adm@gmail.com
2Economia, Sociologia e Tecnologia, Universidade Estadual Paulista, Universidade Estadual Paulista (Unesp), Faculdade de Ciências Agronômicas, Botucatu, R. José Barbosa de Barros, 1780, JardimParaíso, CEP: 18610-034, Botucatu, São Paulo, Brasil, osmar.bueno@unesp.br
3Engenharia de Produção, Faculdade Iteana de Botucatu, Av. Alcides Cagliari, 2601, Jardim Aeroporto, CEP: 18606-855, Botucatu, São Paulo, Brasil, franciscotoledopiza@gmail.com
RESUMO: O trabalho objetivou apresentar o processo de estudo para implantação de Pequenas Centrais Hidrelétricas (PCHs), o momento em que a comunidade local participa deste processo e a importância de sua efetiva participação. Utilizou-se a realidade brasileira no que tange o estudo para implantação de PCHs, a legislação nacional e órgãos envolvidos no processo como: Agência Nacional de Energia Elétrica (ANEEL), Agência Nacional de Águas (ANA), Departamento de Água e Energia Elétrica (DAEE) e Companhia Ambiental do Estado de São Paulo (CETESB). O processo de estudo de um potencial hidráulico conta com cinco fases: Estimativa do Potencial Hidrelétrico; Inventário Hidrelétrico; Estudo de Viabilidade; Projeto Básico e Projeto Executivo. Em consonância a este processo é necessário realizar o Estudo de Impacto Ambiental (EIA) e o respectivo Relatório de Impacto Ambiental (Rima). Como ambiente de diálogo entre todos os atores envolvidos, o processo de licenciamento ambiental conta com as audiências públicas, nessas devem ocorrer trocas de informações e conhecimento das demandas dos diversos envolvidos, inclusive da comunidade local, sua efetiva participação é fundamental para a otimização o projeto nos âmbito socioambiental.
Palavras-chaves: PCHs, licenciamento ambiental, comunicação.
THE SHPs STUDY AND IMPLEMENTATION PROCESS AND IMPORTANCE OF ENVIRONMENTAL LICENSING FOR COMMUNICATION BETWEEN ENTREPRENEURS AND LOCAL COMMUNITY
ABSTRACT: The aim of this paper was to present the process of study and implementation of Small Hydroelectric Power Plants (SHPs), local community participation and the importance of their effective participation. The Brazilian reality was used in the study for the implementation of SHPs, as well as, national legislation and public agencies involved in the process, such as: National Electricity Agency (ANEEL), National Water Agency (ANA), Department of Water and Electric Energy (DAEE) and Environmental Company of the State of São Paulo (CETESB). The process of hydraulic potential study has five stages: hydropower potential estimation; hydraulic inventory; viability study; basic project and executive project. It is also necessary to carry out the Environmental Impact Study (EIA) and Environmental Impact Report (RIMA). According to all the actors involved, the environmental licensing process relies on public hearings, where must occur change of information and knowledge stakeholders demands, including the local community, which effective participation is fundamental for the optimization of the project socio-environmental scope. Keywords: SHPs, environmental licensing, communication.