基于人工蜂群算法的风力发电场拥塞调度

S. Deb, Sadhan Gope, A. Goswami
{"title":"基于人工蜂群算法的风力发电场拥塞调度","authors":"S. Deb, Sadhan Gope, A. Goswami","doi":"10.1109/INDCON.2013.6726002","DOIUrl":null,"url":null,"abstract":"Power system congestion is a major problem for independent system operator (ISO) in a deregulated environment as it violates system security and cost. So it is an important task for ISO to maintain congestion free power system. In this paper generator rescheduling technique has been adopted with incorporation of wind farm in the system. Present work is three folded. Firstly location of wind farm is selected based upon power transfer distribution factor (PTDF). Secondly generator sensitivity factor (GSF) has been determined to reduce number of participating generator in congestion management. Thirdly selected generators have been rescheduled using Artificial Bee Colony (ABC) optimization techniques to mitigate transmission congestion. The proposed method is applied on IEEE 39 bus New England test system.","PeriodicalId":313185,"journal":{"name":"2013 Annual IEEE India Conference (INDICON)","volume":"32 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2013-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"12","resultStr":"{\"title\":\"Generator rescheduling for congestion management with incorporation of wind farm using Artificial Bee Colony algorithm\",\"authors\":\"S. Deb, Sadhan Gope, A. Goswami\",\"doi\":\"10.1109/INDCON.2013.6726002\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Power system congestion is a major problem for independent system operator (ISO) in a deregulated environment as it violates system security and cost. So it is an important task for ISO to maintain congestion free power system. In this paper generator rescheduling technique has been adopted with incorporation of wind farm in the system. Present work is three folded. Firstly location of wind farm is selected based upon power transfer distribution factor (PTDF). Secondly generator sensitivity factor (GSF) has been determined to reduce number of participating generator in congestion management. Thirdly selected generators have been rescheduled using Artificial Bee Colony (ABC) optimization techniques to mitigate transmission congestion. The proposed method is applied on IEEE 39 bus New England test system.\",\"PeriodicalId\":313185,\"journal\":{\"name\":\"2013 Annual IEEE India Conference (INDICON)\",\"volume\":\"32 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2013-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"12\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2013 Annual IEEE India Conference (INDICON)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/INDCON.2013.6726002\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2013 Annual IEEE India Conference (INDICON)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/INDCON.2013.6726002","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 12

摘要

在放松管制的环境下,电力系统拥塞是独立系统运营商(ISO)面临的主要问题,因为它违反了系统的安全性和成本。因此,保持电力系统无拥塞是ISO的一项重要任务。本文采用了将风电场纳入系统的发电机重调度技术。目前的工作是三折的。首先根据输电分配系数(PTDF)选择风电场的选址。其次,确定发电机敏感系数(GSF)以减少参与拥塞管理的发电机数量。再次,采用人工蜂群优化技术对选定的发电机组进行重新调度,以缓解输电拥塞。该方法在ieee39总线新英格兰测试系统中得到了应用。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Generator rescheduling for congestion management with incorporation of wind farm using Artificial Bee Colony algorithm
Power system congestion is a major problem for independent system operator (ISO) in a deregulated environment as it violates system security and cost. So it is an important task for ISO to maintain congestion free power system. In this paper generator rescheduling technique has been adopted with incorporation of wind farm in the system. Present work is three folded. Firstly location of wind farm is selected based upon power transfer distribution factor (PTDF). Secondly generator sensitivity factor (GSF) has been determined to reduce number of participating generator in congestion management. Thirdly selected generators have been rescheduled using Artificial Bee Colony (ABC) optimization techniques to mitigate transmission congestion. The proposed method is applied on IEEE 39 bus New England test system.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Analysis of sleep mode operation with modified non-exhaustive vacation queuing Performance analysis of next generation 3-D OFDM based optical access networks under various system impairments Hardware realization of high speed elliptic curve point multiplication using multiple Point Doublers and point adders Lifetime of a CDMA wireless sensor network with route diversity RF based train collision avoidance system
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1