{"title":"径向配电网中基于MICP的DG布局优化","authors":"M. Mousavi, A. Ranjbar, A. Safdarian","doi":"10.1109/SGC.2017.8308876","DOIUrl":null,"url":null,"abstract":"Electric distribution system is one of the most important parts of power systems owing to delivering electricity to consumers. The major amount of losses in a power system is in distribution level. Optimal distributed generation (DG) placement and sizing have a significant effect on power loss reduction in distribution systems. In this paper, a mixed integer conic programming (MICP) approach is presented to solve the problem of DG placement, sizing, and hourly generation with the aim of reducing power loss and costs in radial distribution systems. The costs include both investment and operational costs of DGs. Hourly load variations are considered in the model. To verify the effectiveness of the proposed solution approach, studies are carried out on the IEEE 33-bus distribution test system.","PeriodicalId":346749,"journal":{"name":"2017 Smart Grid Conference (SGC)","volume":"6 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Optimal DG placement and sizing based on MICP in radial distribution networks\",\"authors\":\"M. Mousavi, A. Ranjbar, A. Safdarian\",\"doi\":\"10.1109/SGC.2017.8308876\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Electric distribution system is one of the most important parts of power systems owing to delivering electricity to consumers. The major amount of losses in a power system is in distribution level. Optimal distributed generation (DG) placement and sizing have a significant effect on power loss reduction in distribution systems. In this paper, a mixed integer conic programming (MICP) approach is presented to solve the problem of DG placement, sizing, and hourly generation with the aim of reducing power loss and costs in radial distribution systems. The costs include both investment and operational costs of DGs. Hourly load variations are considered in the model. To verify the effectiveness of the proposed solution approach, studies are carried out on the IEEE 33-bus distribution test system.\",\"PeriodicalId\":346749,\"journal\":{\"name\":\"2017 Smart Grid Conference (SGC)\",\"volume\":\"6 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2017-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2017 Smart Grid Conference (SGC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/SGC.2017.8308876\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 Smart Grid Conference (SGC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SGC.2017.8308876","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Optimal DG placement and sizing based on MICP in radial distribution networks
Electric distribution system is one of the most important parts of power systems owing to delivering electricity to consumers. The major amount of losses in a power system is in distribution level. Optimal distributed generation (DG) placement and sizing have a significant effect on power loss reduction in distribution systems. In this paper, a mixed integer conic programming (MICP) approach is presented to solve the problem of DG placement, sizing, and hourly generation with the aim of reducing power loss and costs in radial distribution systems. The costs include both investment and operational costs of DGs. Hourly load variations are considered in the model. To verify the effectiveness of the proposed solution approach, studies are carried out on the IEEE 33-bus distribution test system.