{"title":"水轮发电机转子楔式安装技术研究","authors":"Zhou Ruoyu","doi":"10.11648/J.AJWSE.20210703.11","DOIUrl":null,"url":null,"abstract":"When the rotor of the hydroelectric generator is running, the centrifugal force of the rotor rim is very high. Centrifugal force will produce obvious radial deformation on the rotor rim lamination, which will cause a radial separation gap between the rim and the rotor spider. The larger the diameter of the rotor, the larger the separation gap, therefore, when the rotor is assembled, each component is required to have sufficient strength, good balance and integrity. In order to ensure the stability and balance of the rim during the installation, it is necessary to focus on the technical measures to control installation of the wedges, to complete the thermal keying operations in strict accordance with the requirements. The purpose of the rotor thermal keying is to maintain the safety and stability during operation, to facilitate rim and rotor hub to be closely combined, and to achieve a reliable cooperation between them. A certain amount of mechanical compression is applied simultaneously between rim and rotor spider, which can generally be achieved by thermal keying or conventional rim hot keying on the basis of cold keying, the rim is heated to generate gap between rotor rim and hub, the keys are driven to the gap in specified depth. After the rotor rim is cooled down, the effective coordination between rotor rim and rotor hub can be ensured, the centripetal force generated during the operation of the unit can be offset to maintain the unit’s reliable operation. The installation of hydro-generator rotor’s wedge is an important process, it's a matter of the roundness and concentricity, higher requirements is needed for large capacity generators. Based on the structural characteristics of the rotor installed at the Ludila Power Station on the Jinsha River, this article introduces the installation and welding process of the wedges for the rotor at the Ludila Power Station, as well as the difference between thermal keying technology and conventional rim hot keying. Quality control, installing procedure and methods for installation of rotor wedge are described. This article could provide guidance and reference for the implementation of similar projects, research on new advanced technology for the industry.","PeriodicalId":423224,"journal":{"name":"American Journal of Water Science and Engineering","volume":"31 5 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-07-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Technology Research for Rotor Wedge Installation of Hydrogenerator\",\"authors\":\"Zhou Ruoyu\",\"doi\":\"10.11648/J.AJWSE.20210703.11\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"When the rotor of the hydroelectric generator is running, the centrifugal force of the rotor rim is very high. Centrifugal force will produce obvious radial deformation on the rotor rim lamination, which will cause a radial separation gap between the rim and the rotor spider. The larger the diameter of the rotor, the larger the separation gap, therefore, when the rotor is assembled, each component is required to have sufficient strength, good balance and integrity. In order to ensure the stability and balance of the rim during the installation, it is necessary to focus on the technical measures to control installation of the wedges, to complete the thermal keying operations in strict accordance with the requirements. The purpose of the rotor thermal keying is to maintain the safety and stability during operation, to facilitate rim and rotor hub to be closely combined, and to achieve a reliable cooperation between them. A certain amount of mechanical compression is applied simultaneously between rim and rotor spider, which can generally be achieved by thermal keying or conventional rim hot keying on the basis of cold keying, the rim is heated to generate gap between rotor rim and hub, the keys are driven to the gap in specified depth. After the rotor rim is cooled down, the effective coordination between rotor rim and rotor hub can be ensured, the centripetal force generated during the operation of the unit can be offset to maintain the unit’s reliable operation. The installation of hydro-generator rotor’s wedge is an important process, it's a matter of the roundness and concentricity, higher requirements is needed for large capacity generators. Based on the structural characteristics of the rotor installed at the Ludila Power Station on the Jinsha River, this article introduces the installation and welding process of the wedges for the rotor at the Ludila Power Station, as well as the difference between thermal keying technology and conventional rim hot keying. Quality control, installing procedure and methods for installation of rotor wedge are described. This article could provide guidance and reference for the implementation of similar projects, research on new advanced technology for the industry.\",\"PeriodicalId\":423224,\"journal\":{\"name\":\"American Journal of Water Science and Engineering\",\"volume\":\"31 5 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-07-08\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"American Journal of Water Science and Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.11648/J.AJWSE.20210703.11\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"American Journal of Water Science and Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.11648/J.AJWSE.20210703.11","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

水轮发电机转子运行时,转子轮缘的离心力很大。离心力会在转子轮缘层合上产生明显的径向变形,使轮缘与转子悬架之间产生径向分离间隙。转子直径越大,分离间隙越大,因此,在装配转子时,要求各部件具有足够的强度、良好的平衡性和完整性。为了保证轮辋在安装过程中的稳定性和平衡性,需要重点关注控制楔块安装的技术措施,严格按照要求完成热键控操作。转子热键控的目的是为了保持运行过程中的安全稳定,便于轮辋与转子轮毂紧密结合,实现两者之间的可靠配合。轮辋与轮毂之间同时施加一定的机械压缩,一般可在冷键接的基础上通过热键接或常规轮辋热键接来实现,轮辋被加热使转子轮辋与轮毂之间产生间隙,键被驱动到规定深度的间隙内。转子轮辋冷却后,可以保证转子轮辋与转子轮毂之间的有效配合,抵消机组运行过程中产生的向心力,保持机组的可靠运行。水轮发电机转子楔块的安装是水轮发电机转子楔块的一个重要工序,它关系到转子的圆度和同心度,对大容量发电机的安装要求较高。根据金沙江鲁地拉电站转子的结构特点,介绍了鲁地拉电站转子楔块的安装和焊接工艺,以及热键控技术与常规轮辋热键控技术的区别。介绍了转子楔块的质量控制、安装步骤和安装方法。本文可为同类工程的实施、行业先进新技术的研究提供指导和借鉴。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Technology Research for Rotor Wedge Installation of Hydrogenerator
When the rotor of the hydroelectric generator is running, the centrifugal force of the rotor rim is very high. Centrifugal force will produce obvious radial deformation on the rotor rim lamination, which will cause a radial separation gap between the rim and the rotor spider. The larger the diameter of the rotor, the larger the separation gap, therefore, when the rotor is assembled, each component is required to have sufficient strength, good balance and integrity. In order to ensure the stability and balance of the rim during the installation, it is necessary to focus on the technical measures to control installation of the wedges, to complete the thermal keying operations in strict accordance with the requirements. The purpose of the rotor thermal keying is to maintain the safety and stability during operation, to facilitate rim and rotor hub to be closely combined, and to achieve a reliable cooperation between them. A certain amount of mechanical compression is applied simultaneously between rim and rotor spider, which can generally be achieved by thermal keying or conventional rim hot keying on the basis of cold keying, the rim is heated to generate gap between rotor rim and hub, the keys are driven to the gap in specified depth. After the rotor rim is cooled down, the effective coordination between rotor rim and rotor hub can be ensured, the centripetal force generated during the operation of the unit can be offset to maintain the unit’s reliable operation. The installation of hydro-generator rotor’s wedge is an important process, it's a matter of the roundness and concentricity, higher requirements is needed for large capacity generators. Based on the structural characteristics of the rotor installed at the Ludila Power Station on the Jinsha River, this article introduces the installation and welding process of the wedges for the rotor at the Ludila Power Station, as well as the difference between thermal keying technology and conventional rim hot keying. Quality control, installing procedure and methods for installation of rotor wedge are described. This article could provide guidance and reference for the implementation of similar projects, research on new advanced technology for the industry.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Research on Construction Technology of Steel Bifurcation for Diversion System in Pumped Storage Power Station Under Complex Conditions Defluoridation of Groundwater by Activated Carbon Derived from Water Hyacinth (Pontederia crassipes) by Phosphoric Acid Activation Stone Quarries and Hydrological Regime of Roshi with Emphasis on Sedimentation Validation of Ex-Situ Runoff Harvesting in Semi-Arid Areas Using Grid-Based NRCS – CN Assessment of Surface Irrigation Potential Using Geospatial Technology in the Megecha River Catchment
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1