土工合成加固路堤斜坡

A. Jha, Madhav R. Madhira
{"title":"土工合成加固路堤斜坡","authors":"A. Jha, Madhav R. Madhira","doi":"10.5772/intechopen.95106","DOIUrl":null,"url":null,"abstract":"Slope failures lead to loss of life and damage to property. Slope instability of natural slope depends on natural and manmade factors such as excessive rainfall, earthquakes, deforestation, unplanned construction activity, etc. Manmade slopes are formed for embankments and cuttings. Steepening of slopes for construction of rail/road embankments or for widening of existing roads is a necessity for development. Use of geosynthetics for steep slope construction considering design and environmental aspects could be a viable alternative to these issues. Methods developed for unreinforced slopes have been extended to analyze geosynthetic reinforced slopes accounting for the presence of reinforcement. Designing geosynthetic reinforced slope with minimum length of geosynthetics leads to economy. This chapter presents review of literature and design methodologies available for reinforced slopes with granular and marginal backfills. Optimization of reinforcement length from face end of the slope and slope - reinforcement interactions are also presented.","PeriodicalId":249418,"journal":{"name":"Slope Engineering","volume":"41 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-12-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Geoysynthetic Reinforced Embankment Slopes\",\"authors\":\"A. Jha, Madhav R. Madhira\",\"doi\":\"10.5772/intechopen.95106\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Slope failures lead to loss of life and damage to property. Slope instability of natural slope depends on natural and manmade factors such as excessive rainfall, earthquakes, deforestation, unplanned construction activity, etc. Manmade slopes are formed for embankments and cuttings. Steepening of slopes for construction of rail/road embankments or for widening of existing roads is a necessity for development. Use of geosynthetics for steep slope construction considering design and environmental aspects could be a viable alternative to these issues. Methods developed for unreinforced slopes have been extended to analyze geosynthetic reinforced slopes accounting for the presence of reinforcement. Designing geosynthetic reinforced slope with minimum length of geosynthetics leads to economy. This chapter presents review of literature and design methodologies available for reinforced slopes with granular and marginal backfills. Optimization of reinforcement length from face end of the slope and slope - reinforcement interactions are also presented.\",\"PeriodicalId\":249418,\"journal\":{\"name\":\"Slope Engineering\",\"volume\":\"41 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-12-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Slope Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5772/intechopen.95106\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Slope Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5772/intechopen.95106","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

边坡破坏会导致生命损失和财产损失。天然边坡的失稳取决于自然和人为因素,如降雨过多、地震、森林砍伐、计划外的建筑活动等。人造斜坡形成堤坝和岩屑。为兴建铁路/公路路堤或扩阔现有道路而使斜坡变陡,是发展的需要。考虑到设计和环境因素,在陡坡施工中使用土工合成材料可能是解决这些问题的可行选择。为未加筋边坡开发的方法已扩展到分析考虑加筋的土工合成加筋边坡。设计土工合成材料长度最小的土工合成材料加固边坡,具有经济性。本章回顾了具有颗粒状和边缘充填体的加固边坡的文献和设计方法。本文还讨论了坡面端配筋长度优化和坡-配筋相互作用。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Geoysynthetic Reinforced Embankment Slopes
Slope failures lead to loss of life and damage to property. Slope instability of natural slope depends on natural and manmade factors such as excessive rainfall, earthquakes, deforestation, unplanned construction activity, etc. Manmade slopes are formed for embankments and cuttings. Steepening of slopes for construction of rail/road embankments or for widening of existing roads is a necessity for development. Use of geosynthetics for steep slope construction considering design and environmental aspects could be a viable alternative to these issues. Methods developed for unreinforced slopes have been extended to analyze geosynthetic reinforced slopes accounting for the presence of reinforcement. Designing geosynthetic reinforced slope with minimum length of geosynthetics leads to economy. This chapter presents review of literature and design methodologies available for reinforced slopes with granular and marginal backfills. Optimization of reinforcement length from face end of the slope and slope - reinforcement interactions are also presented.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Ecological Engineering Measures for Ravine Slope Stabilization and Its Sustainable Productive Utilization Geoysynthetic Reinforced Embankment Slopes Three Dimensional Slope Stability Analysis of Open Pit Mine
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1