{"title":"Kinerja Bus Trans Batam Koridor I (Sekupang – Batam Center)","authors":"M. Dita, Adhitomo Wirawan","doi":"10.25292/J.MTL.V7I3.451","DOIUrl":null,"url":null,"abstract":"This study aims to analyze the performance of Batam BRT (Bus Rapid Transit) Corridor I (Sekupang - Batam Center). The average waiting time, the average travel time of bus stop from one to the other, the average number of passengers during working hours and the average total time travel were analyzed. This study is an evaluative research. The data used in this study is primary data taken from an observation and interview. The population of the study was Batam BRT Corridor I Sekupang-Batam Center with one driver as the sample. The standard used to evaluate the performance of Batam BRT is the World Bank public transport performance standard. The result of the study shows that the performance of Batam BRT does not meet the World Bank public transport performance standard.","PeriodicalId":227253,"journal":{"name":"Jurnal Manajemen Transportasi & Logistik (JMTRANSLOG)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2021-04-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Manajemen Transportasi & Logistik (JMTRANSLOG)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.25292/J.MTL.V7I3.451","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本研究旨在分析巴淡岛快速公交(BRT)走廊1号(塞古邦-巴淡中心)的绩效。分析了平均等待时间、公交站点之间的平均行程时间、工作时间内的平均乘客人数和平均总行程时间。本研究为评价性研究。本研究使用的数据是来自观察和访谈的原始数据。研究人群为巴淡BRT走廊I Sekupang-Batam中心,以一名司机为样本。用于评价巴淡岛快速公交系统绩效的标准是世界银行公共交通绩效标准。研究结果表明,巴淡岛快速公交系统的绩效不符合世界银行公共交通绩效标准。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Kinerja Bus Trans Batam Koridor I (Sekupang – Batam Center)
This study aims to analyze the performance of Batam BRT (Bus Rapid Transit) Corridor I (Sekupang - Batam Center). The average waiting time, the average travel time of bus stop from one to the other, the average number of passengers during working hours and the average total time travel were analyzed. This study is an evaluative research. The data used in this study is primary data taken from an observation and interview. The population of the study was Batam BRT Corridor I Sekupang-Batam Center with one driver as the sample. The standard used to evaluate the performance of Batam BRT is the World Bank public transport performance standard. The result of the study shows that the performance of Batam BRT does not meet the World Bank public transport performance standard.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Pemodelan Data Kecelakaan pada Perlintasan Sebidang Kereta Api DAOP VII Madiun Kerangka Kerja Evaluasi Kesesuaian Implementasi Vendor Managed Inventory Penerapan Matriks Boston Consulting Group untuk Penanganan Muatan Barang Berbahaya pada Kapal Barang Nasional Efektifitas Pengelolaan Manajemen Pergudangan Terhadap Sistem Distribusi Beras pada Pemerintah Daerah DKI Jakarta Produktivitas Kerja Awak Kapal pada Kapal Tanker Nasional di Indonesia
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1