{"title":"单元制造周期批量控制计划系统的设计","authors":"J. Riezebos","doi":"10.1615/faim1999.450","DOIUrl":null,"url":null,"abstract":"Thesis 1 Introduction 2 Relationships between cells 3 Period Batch Control 4 Design factors for basic unicycle PBC systems 5 Models and methods for determining a period length P 6 Modelling the trade-off between N and P 7 Determining a configuration of the PBC system 8 Co- ordination between cells and PBC system design 9 Conclusions and further research Appendices: Short case descriptions","PeriodicalId":127745,"journal":{"name":"Proceeding of Flexible Automation and Integrated Manufacturing 1999","volume":"13 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":"{\"title\":\"DESIGN OF A PERIOD BATCH CONTROL PLANNING SYSTEM FOR CELLULAR MANUFACTURING\",\"authors\":\"J. Riezebos\",\"doi\":\"10.1615/faim1999.450\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Thesis 1 Introduction 2 Relationships between cells 3 Period Batch Control 4 Design factors for basic unicycle PBC systems 5 Models and methods for determining a period length P 6 Modelling the trade-off between N and P 7 Determining a configuration of the PBC system 8 Co- ordination between cells and PBC system design 9 Conclusions and further research Appendices: Short case descriptions\",\"PeriodicalId\":127745,\"journal\":{\"name\":\"Proceeding of Flexible Automation and Integrated Manufacturing 1999\",\"volume\":\"13 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"6\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceeding of Flexible Automation and Integrated Manufacturing 1999\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1615/faim1999.450\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceeding of Flexible Automation and Integrated Manufacturing 1999","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1615/faim1999.450","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
DESIGN OF A PERIOD BATCH CONTROL PLANNING SYSTEM FOR CELLULAR MANUFACTURING
Thesis 1 Introduction 2 Relationships between cells 3 Period Batch Control 4 Design factors for basic unicycle PBC systems 5 Models and methods for determining a period length P 6 Modelling the trade-off between N and P 7 Determining a configuration of the PBC system 8 Co- ordination between cells and PBC system design 9 Conclusions and further research Appendices: Short case descriptions