基于综合风险屋和鱼骨图方法的金属加工油液业务流程风险缓解

C. Natalia, C. Oktavia, Sonia Artha Ria Silaban, F. P. Surbakti
{"title":"基于综合风险屋和鱼骨图方法的金属加工油液业务流程风险缓解","authors":"C. Natalia, C. Oktavia, Sonia Artha Ria Silaban, F. P. Surbakti","doi":"10.25170/metris.v22i02.3040","DOIUrl":null,"url":null,"abstract":"Business processes take an essential role in creating strategic goals for every company. However, It is not easy things in current condition. In the business process, every company has many vulnerable activities to risk. This research was conducted in the company engaged in the manufacturing industry that produces and supplies metalworking oils & fluids. So far, the company has experienced risk events such as late production and late delivery. This research aims to analyse and design the risk mitigation strategies of the company’s supply chain by using House of Risk and Fishbone Diagram approaches. By integrating these two methods, the root of the risk agent can be specifically identified and make it easier to design risk mitigation strategies. The purpose of this research is to analyse and design a risk mitigation strategy using the integrated HOR and Fishbone Diagram approach in the supply chain of a metalworking oils & fluids company. This research indicates twenty risk events, six priority risk agents, sixteen root of risk agents, and six priority mitigation strategies. The six priority mitigation strategies include implementing reward and punishment for better SOP, starting with briefing every day before activities, providing regular training to the employees, hiring great employees, establishing employee performance appraisal effectively, and maintaining machines preventively. \n ","PeriodicalId":402087,"journal":{"name":"Jurnal METRIS","volume":"61 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-02-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Risk Mitigation on Metalworking Oil & Fluids Business Process by Integrated House Of Risk (HOR) and Fishbone Diagram Approach\",\"authors\":\"C. Natalia, C. Oktavia, Sonia Artha Ria Silaban, F. P. Surbakti\",\"doi\":\"10.25170/metris.v22i02.3040\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Business processes take an essential role in creating strategic goals for every company. However, It is not easy things in current condition. In the business process, every company has many vulnerable activities to risk. This research was conducted in the company engaged in the manufacturing industry that produces and supplies metalworking oils & fluids. So far, the company has experienced risk events such as late production and late delivery. This research aims to analyse and design the risk mitigation strategies of the company’s supply chain by using House of Risk and Fishbone Diagram approaches. By integrating these two methods, the root of the risk agent can be specifically identified and make it easier to design risk mitigation strategies. The purpose of this research is to analyse and design a risk mitigation strategy using the integrated HOR and Fishbone Diagram approach in the supply chain of a metalworking oils & fluids company. This research indicates twenty risk events, six priority risk agents, sixteen root of risk agents, and six priority mitigation strategies. The six priority mitigation strategies include implementing reward and punishment for better SOP, starting with briefing every day before activities, providing regular training to the employees, hiring great employees, establishing employee performance appraisal effectively, and maintaining machines preventively. \\n \",\"PeriodicalId\":402087,\"journal\":{\"name\":\"Jurnal METRIS\",\"volume\":\"61 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-02-10\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal METRIS\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.25170/metris.v22i02.3040\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal METRIS","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.25170/metris.v22i02.3040","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

业务流程在为每个公司创建战略目标方面发挥着重要作用。然而,在目前的情况下,这不是一件容易的事情。在业务流程中,每个公司都有许多易受风险影响的活动。本研究是在从事生产和供应金属加工油和流体的制造行业的公司进行的。到目前为止,该公司已经经历了延迟生产和延迟交货等风险事件。本研究旨在利用风险屋和鱼骨图方法分析和设计公司供应链的风险缓解策略。通过整合这两种方法,可以明确确定风险因素的根源,并使设计风险缓解策略更加容易。本研究的目的是在一家金属加工油和流体公司的供应链中,使用集成的HOR和鱼骨图方法来分析和设计风险缓解策略。本研究指出了20个风险事件、6个优先风险因子、16个风险因子根源和6个优先缓解策略。六项优先缓解策略包括:实施奖惩完善SOP、从每天活动前的简报开始、定期对员工进行培训、聘用优秀员工、有效建立员工绩效考核、预防性维护机器。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Risk Mitigation on Metalworking Oil & Fluids Business Process by Integrated House Of Risk (HOR) and Fishbone Diagram Approach
Business processes take an essential role in creating strategic goals for every company. However, It is not easy things in current condition. In the business process, every company has many vulnerable activities to risk. This research was conducted in the company engaged in the manufacturing industry that produces and supplies metalworking oils & fluids. So far, the company has experienced risk events such as late production and late delivery. This research aims to analyse and design the risk mitigation strategies of the company’s supply chain by using House of Risk and Fishbone Diagram approaches. By integrating these two methods, the root of the risk agent can be specifically identified and make it easier to design risk mitigation strategies. The purpose of this research is to analyse and design a risk mitigation strategy using the integrated HOR and Fishbone Diagram approach in the supply chain of a metalworking oils & fluids company. This research indicates twenty risk events, six priority risk agents, sixteen root of risk agents, and six priority mitigation strategies. The six priority mitigation strategies include implementing reward and punishment for better SOP, starting with briefing every day before activities, providing regular training to the employees, hiring great employees, establishing employee performance appraisal effectively, and maintaining machines preventively.  
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Penerapan Rantai Markov Pada Pola Perpindahan Pembelian di Produk Songkok The Application of Sentiment Analysis on Customers Responses in Social Media (Case Study: Indihome and First Media Internet Service Provider) PENJADWALAN PERAWAT BERDASARKAN MINIMASI PELANGGARAN PERATURAN DAN MINIMASI BIAYA LEMBUR Natural Tourism Potential Assessment Model in Rembang Regency Analisis Peramalan Dengan Simulasi Monte Carlo dan Implementasi Pengendalian Persediaan Gula Berdasarkan EOQ
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1