{"title":"纸业生产材料需求规划分析(MRP)","authors":"S. Lestari, Distian Dwi Nurdiansah","doi":"10.30656/intech.v4i2.956","DOIUrl":null,"url":null,"abstract":"The development of the business world is currently experiencing a very rapid growth rate. Planning for the proper procurement of materials will be able to facilitate the company's production activities. Production process activities in companies often experience problems such as inaccurate production, which is caused by delays in the arrival of raw materials, and damage to raw materials due to too long storing in warehouses. This study aims to plan future needs with the Material Requirement Planning (MRP) approach by doing forecasting, making the Master Production Schedule (MPS), Material Requirement Planning (MRP) and conducting a cost analysis of the five methods used. The results of this study are forecasting product demand will be used linear regression method, and effective material requirements planning method with the lowest cost is to use the Lot For Lot (LFL) method of $ 164.48. The application of the Lot For Lot method can reduce costs by 90.06% compared to the Fixed Period Requirements (FPR) method used by the company.","PeriodicalId":120847,"journal":{"name":"Jurnal INTECH Teknik Industri Universitas Serang Raya","volume":"59 9","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-12-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Analisa Perencanaan Kebutuhan Material pada Perusahaan Manufaktur Kertas dengan Metode Material Requirement Planning (MRP)\",\"authors\":\"S. Lestari, Distian Dwi Nurdiansah\",\"doi\":\"10.30656/intech.v4i2.956\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The development of the business world is currently experiencing a very rapid growth rate. Planning for the proper procurement of materials will be able to facilitate the company's production activities. Production process activities in companies often experience problems such as inaccurate production, which is caused by delays in the arrival of raw materials, and damage to raw materials due to too long storing in warehouses. This study aims to plan future needs with the Material Requirement Planning (MRP) approach by doing forecasting, making the Master Production Schedule (MPS), Material Requirement Planning (MRP) and conducting a cost analysis of the five methods used. The results of this study are forecasting product demand will be used linear regression method, and effective material requirements planning method with the lowest cost is to use the Lot For Lot (LFL) method of $ 164.48. The application of the Lot For Lot method can reduce costs by 90.06% compared to the Fixed Period Requirements (FPR) method used by the company.\",\"PeriodicalId\":120847,\"journal\":{\"name\":\"Jurnal INTECH Teknik Industri Universitas Serang Raya\",\"volume\":\"59 9\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-12-27\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal INTECH Teknik Industri Universitas Serang Raya\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.30656/intech.v4i2.956\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal INTECH Teknik Industri Universitas Serang Raya","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30656/intech.v4i2.956","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3
摘要
商业世界的发展目前正经历着一个非常快速的增长速度。策划适当的物料采购将能够方便公司的生产活动。公司的生产过程活动经常会遇到一些问题,如由于原材料的延迟到达而导致的生产不准确,以及由于在仓库中储存时间过长而导致的原材料损坏。本研究旨在通过预测、制作主生产计划(MPS)、物料需求计划(MRP)和对所使用的五种方法进行成本分析,以物料需求计划(MRP)方法来计划未来的需求。本研究的结果是,预测产品需求将采用线性回归方法,而成本最低的有效物料需求规划方法是采用164.48美元的Lot For Lot (LFL)方法。与公司使用的固定期限要求(FPR)方法相比,应用批对批方法可以降低90.06%的成本。
Analisa Perencanaan Kebutuhan Material pada Perusahaan Manufaktur Kertas dengan Metode Material Requirement Planning (MRP)
The development of the business world is currently experiencing a very rapid growth rate. Planning for the proper procurement of materials will be able to facilitate the company's production activities. Production process activities in companies often experience problems such as inaccurate production, which is caused by delays in the arrival of raw materials, and damage to raw materials due to too long storing in warehouses. This study aims to plan future needs with the Material Requirement Planning (MRP) approach by doing forecasting, making the Master Production Schedule (MPS), Material Requirement Planning (MRP) and conducting a cost analysis of the five methods used. The results of this study are forecasting product demand will be used linear regression method, and effective material requirements planning method with the lowest cost is to use the Lot For Lot (LFL) method of $ 164.48. The application of the Lot For Lot method can reduce costs by 90.06% compared to the Fixed Period Requirements (FPR) method used by the company.