{"title":"开发了风险评估的简化方法","authors":"N. Szedenik, Tamas Bodocs, I. Kiss, I. Berta","doi":"10.1109/ICLP.2016.7791378","DOIUrl":null,"url":null,"abstract":"The IEC 62305, which was published 10 years ago, has fundamentally changed the structure of planning lightning protection [1]. The method determined in the standard - which requires a detailed risk assessment for each and every structure - has made the standard user's task more difficult due to the vast amount of parameters. Meantime many criticism, application examples and explanations of the risk assessment were published [2], [3], [4], [5]. We have elaborated a developed simplified risk assessment process based on the standard, which substantially facilitates the determination of the needed level of protection in most cases.","PeriodicalId":373744,"journal":{"name":"2016 33rd International Conference on Lightning Protection (ICLP)","volume":"31 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Developed simplification of the risk assessment\",\"authors\":\"N. Szedenik, Tamas Bodocs, I. Kiss, I. Berta\",\"doi\":\"10.1109/ICLP.2016.7791378\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The IEC 62305, which was published 10 years ago, has fundamentally changed the structure of planning lightning protection [1]. The method determined in the standard - which requires a detailed risk assessment for each and every structure - has made the standard user's task more difficult due to the vast amount of parameters. Meantime many criticism, application examples and explanations of the risk assessment were published [2], [3], [4], [5]. We have elaborated a developed simplified risk assessment process based on the standard, which substantially facilitates the determination of the needed level of protection in most cases.\",\"PeriodicalId\":373744,\"journal\":{\"name\":\"2016 33rd International Conference on Lightning Protection (ICLP)\",\"volume\":\"31 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2016 33rd International Conference on Lightning Protection (ICLP)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICLP.2016.7791378\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 33rd International Conference on Lightning Protection (ICLP)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICLP.2016.7791378","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
The IEC 62305, which was published 10 years ago, has fundamentally changed the structure of planning lightning protection [1]. The method determined in the standard - which requires a detailed risk assessment for each and every structure - has made the standard user's task more difficult due to the vast amount of parameters. Meantime many criticism, application examples and explanations of the risk assessment were published [2], [3], [4], [5]. We have elaborated a developed simplified risk assessment process based on the standard, which substantially facilitates the determination of the needed level of protection in most cases.