{"title":"公司推行精益生产,致力于粮食生产","authors":"Thays Arotoma, G. Quispe, Heyul Chavez, Elva Castañeda","doi":"10.54941/ahfe1001201","DOIUrl":null,"url":null,"abstract":"The following investigation shows the problems in “Industria Granero del Centro EIRL”, it is a company that is dedicated to the production of grains such as split bean, split wheat, american morón and corn flour. The goal is to improve the production planning and scheduling system and eliminate overproduction and economic losses. VSM (Value Stream Mapping) was used to identify the improvement in the production process. The root causes of the problem were then determined using the Ishikawa diagram. The activities to be carried out are identification of times of each process of the evaluated product, carry out the implementation of the master pro-duction plan, application of Kanban and application of Heijunka for load balancing. The results of this implementation will be visualized through a simulation making use of efficiency, effectiveness, and productivity indicators to meet the objective","PeriodicalId":116806,"journal":{"name":"Human Systems Engineering and Design (IHSED2021) Future Trends and Applications","volume":"40 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Implementation of Lean Manufacturing in the Company Dedicated to the Production of Grains\",\"authors\":\"Thays Arotoma, G. Quispe, Heyul Chavez, Elva Castañeda\",\"doi\":\"10.54941/ahfe1001201\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The following investigation shows the problems in “Industria Granero del Centro EIRL”, it is a company that is dedicated to the production of grains such as split bean, split wheat, american morón and corn flour. The goal is to improve the production planning and scheduling system and eliminate overproduction and economic losses. VSM (Value Stream Mapping) was used to identify the improvement in the production process. The root causes of the problem were then determined using the Ishikawa diagram. The activities to be carried out are identification of times of each process of the evaluated product, carry out the implementation of the master pro-duction plan, application of Kanban and application of Heijunka for load balancing. The results of this implementation will be visualized through a simulation making use of efficiency, effectiveness, and productivity indicators to meet the objective\",\"PeriodicalId\":116806,\"journal\":{\"name\":\"Human Systems Engineering and Design (IHSED2021) Future Trends and Applications\",\"volume\":\"40 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Human Systems Engineering and Design (IHSED2021) Future Trends and Applications\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.54941/ahfe1001201\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Human Systems Engineering and Design (IHSED2021) Future Trends and Applications","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.54941/ahfe1001201","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
摘要
下面的调查显示了“Industria Granero del Centro EIRL”的问题,这是一家致力于生产分裂豆,分裂小麦,美国morón和玉米粉等谷物的公司。目标是改善生产计划和调度系统,消除生产过剩和经济损失。价值流图(VSM)用于识别生产过程中的改进。然后使用Ishikawa图确定问题的根本原因。要进行的活动是确定被评估产品的每个过程的时间,进行生产主计划的实施,应用看板和应用Heijunka进行负载平衡。该实现的结果将通过模拟来可视化,利用效率、有效性和生产率指标来实现目标
Implementation of Lean Manufacturing in the Company Dedicated to the Production of Grains
The following investigation shows the problems in “Industria Granero del Centro EIRL”, it is a company that is dedicated to the production of grains such as split bean, split wheat, american morón and corn flour. The goal is to improve the production planning and scheduling system and eliminate overproduction and economic losses. VSM (Value Stream Mapping) was used to identify the improvement in the production process. The root causes of the problem were then determined using the Ishikawa diagram. The activities to be carried out are identification of times of each process of the evaluated product, carry out the implementation of the master pro-duction plan, application of Kanban and application of Heijunka for load balancing. The results of this implementation will be visualized through a simulation making use of efficiency, effectiveness, and productivity indicators to meet the objective