采用有限元法对3号“西拉”隧道洞口的位移及稳定性进行了评价

Joaquín Franco F., Freddy Viveros M., Fabiana Viscarra A.
{"title":"采用有限元法对3号“西拉”隧道洞口的位移及稳定性进行了评价","authors":"Joaquín Franco F., Freddy Viveros M., Fabiana Viscarra A.","doi":"10.23881/idupbo.022.1-8i","DOIUrl":null,"url":null,"abstract":"As an application of geotechnical engineering, an analysis of portal stability of the exit of Tunnel 3, in the construction of the double lane central section \"El Sillar\" Cochabamba - Santa Cruz highway is presented. This study is carried out by using the finite element method FEM with the PLAXIS 3D software to determine the areas where slope stabilization of the portal is needed and the definition of the excavation construction method along with the support system for the tunnel. Later, the tunnel structure is evaluated. Initially, data compilation from geotechnical studies is done (pits, geomechanical stations, geophysical survey, in situ and laboratory tests on drilled rock cores) contrasted with proper bibliographic referenced ranges to obtain initial geomechanical conditions. Subsequently, mechanical parameters of the rock are calibrated by means of real deformations caused by the excavation of the tunnel in the portal with a plastic-type calculation. The calibrated model achieves the average measured deformation on the tunnel: 5 mm. Then, the stability analysis is carried out by means of a safety-type calculation to obtain global safety factors where different stabilization alternatives are assessed. In this way, the modification of the slope geometry is revealed as the most optimal solution. Subsequently, the construction stages of the tunnel are simulated by adopting the Belgium method, the largest number of supports is required, because it is a very unstable area. Finally, principal effective stresses and deformations for static and pseudo-static conditions are calculated and reach admissible values (6, 12 mm maximum deformation in the vault) and minimum safety factors were above minimum factors required by NSR-10: 1,25 and 1,0; assessing most optimal geometry considering reinforced and non-reinforced conditions in the tunnel at three different depths and lateral covers for the tunnel.","PeriodicalId":127243,"journal":{"name":"Revista Investigación & Desarrollo","volume":"16 10 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-07-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"DISPLACEMENTS AND STABILITY ASSESSMENT IN THE PORTAL OF TUNNEL 3, \\\"EL SILLAR\\\", THROUGH THE FINITE ELEMENT METHOD\",\"authors\":\"Joaquín Franco F., Freddy Viveros M., Fabiana Viscarra A.\",\"doi\":\"10.23881/idupbo.022.1-8i\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"As an application of geotechnical engineering, an analysis of portal stability of the exit of Tunnel 3, in the construction of the double lane central section \\\"El Sillar\\\" Cochabamba - Santa Cruz highway is presented. This study is carried out by using the finite element method FEM with the PLAXIS 3D software to determine the areas where slope stabilization of the portal is needed and the definition of the excavation construction method along with the support system for the tunnel. Later, the tunnel structure is evaluated. Initially, data compilation from geotechnical studies is done (pits, geomechanical stations, geophysical survey, in situ and laboratory tests on drilled rock cores) contrasted with proper bibliographic referenced ranges to obtain initial geomechanical conditions. Subsequently, mechanical parameters of the rock are calibrated by means of real deformations caused by the excavation of the tunnel in the portal with a plastic-type calculation. The calibrated model achieves the average measured deformation on the tunnel: 5 mm. Then, the stability analysis is carried out by means of a safety-type calculation to obtain global safety factors where different stabilization alternatives are assessed. In this way, the modification of the slope geometry is revealed as the most optimal solution. Subsequently, the construction stages of the tunnel are simulated by adopting the Belgium method, the largest number of supports is required, because it is a very unstable area. Finally, principal effective stresses and deformations for static and pseudo-static conditions are calculated and reach admissible values (6, 12 mm maximum deformation in the vault) and minimum safety factors were above minimum factors required by NSR-10: 1,25 and 1,0; assessing most optimal geometry considering reinforced and non-reinforced conditions in the tunnel at three different depths and lateral covers for the tunnel.\",\"PeriodicalId\":127243,\"journal\":{\"name\":\"Revista Investigación & Desarrollo\",\"volume\":\"16 10 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-07-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Revista Investigación & Desarrollo\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.23881/idupbo.022.1-8i\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Revista Investigación & Desarrollo","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.23881/idupbo.022.1-8i","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

作为岩土工程的应用,对科什班巴-圣克鲁兹公路“El Sillar”双车道中段3号隧道出口的入口稳定性进行了分析。本研究采用有限元法FEM,结合PLAXIS 3D软件,确定隧洞需要稳定边坡的区域,确定开挖施工方法及隧道支护体系。随后,对隧道结构进行了评估。首先,将地质技术研究(坑、地质力学站、地球物理调查、钻孔岩心的现场和实验室测试)的数据汇编与适当的参考书目范围进行对比,以获得初始地质力学条件。随后,通过对隧洞开挖引起的实际变形进行塑性计算,标定岩石力学参数。校正后的模型在隧道上的平均实测变形为5mm。然后,通过安全型计算进行稳定性分析,获得全局安全系数,并对不同的稳定方案进行评估。通过这种方法,揭示了边坡几何形状的修正是最优解。随后,隧道施工阶段采用比利时法进行模拟,由于该区域非常不稳定,需要最大数量的支护。最后,对静力和拟静力条件下的主有效应力和变形进行了计算,均达到允许值(拱顶最大变形为6,12 mm),最小安全系数高于NSR-10要求的最小系数:1,25和1,0;考虑隧道三种不同深度的加固和非加固情况以及隧道的侧盖,评估最优的几何形状。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
DISPLACEMENTS AND STABILITY ASSESSMENT IN THE PORTAL OF TUNNEL 3, "EL SILLAR", THROUGH THE FINITE ELEMENT METHOD
As an application of geotechnical engineering, an analysis of portal stability of the exit of Tunnel 3, in the construction of the double lane central section "El Sillar" Cochabamba - Santa Cruz highway is presented. This study is carried out by using the finite element method FEM with the PLAXIS 3D software to determine the areas where slope stabilization of the portal is needed and the definition of the excavation construction method along with the support system for the tunnel. Later, the tunnel structure is evaluated. Initially, data compilation from geotechnical studies is done (pits, geomechanical stations, geophysical survey, in situ and laboratory tests on drilled rock cores) contrasted with proper bibliographic referenced ranges to obtain initial geomechanical conditions. Subsequently, mechanical parameters of the rock are calibrated by means of real deformations caused by the excavation of the tunnel in the portal with a plastic-type calculation. The calibrated model achieves the average measured deformation on the tunnel: 5 mm. Then, the stability analysis is carried out by means of a safety-type calculation to obtain global safety factors where different stabilization alternatives are assessed. In this way, the modification of the slope geometry is revealed as the most optimal solution. Subsequently, the construction stages of the tunnel are simulated by adopting the Belgium method, the largest number of supports is required, because it is a very unstable area. Finally, principal effective stresses and deformations for static and pseudo-static conditions are calculated and reach admissible values (6, 12 mm maximum deformation in the vault) and minimum safety factors were above minimum factors required by NSR-10: 1,25 and 1,0; assessing most optimal geometry considering reinforced and non-reinforced conditions in the tunnel at three different depths and lateral covers for the tunnel.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
REMOCIÓN DE LA MATERIA ORGÁNICA DE AGUAS RESIDUALES DE LA INDUSTRIA TEXTIL MEDIANTE LA APLICACIÓN DE FERRATO DE POTASIO SINTETIZADO ANÁLISIS DE RESILIENCIA CLIMÁTICA DEL PROYECTO SISTEMA DE AGUA POTABLE EN COMUNIDAD HUAYRAPATA EXPERIENTIAL LEARNING AS A METHODOLOGY TO ENGAGE EDUCATIONAL INITIATIVES TO OPERATIONAL PROBLEMATICS IN MICRO COMPANIES SISTEMA DE MONITOREO REMOTO DE RESPIRACIÓN Y NIVELES DE GASES PARA PACIENTES RECUPERADOS DE COVID-19 DESIGN, PRODUCTION AND PLACEMENT OF HOT MIX ASPHALT WITH ADDITION OF WASTE PLASTICS - BOLIVIA CASE STUDY
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1