{"title":"用模糊认知图建模施工管理问题","authors":"Denise M. Case, T. Blackburn, C. Stylios","doi":"10.1108/978-1-78743-868-220181012","DOIUrl":null,"url":null,"abstract":"Abstract \nThis chapter discusses the application of fuzzy cognitive map (FCM) modelling to construction management (CM) challenges and problems. It focuses on the critical issue of managing the complexity and uncertainty inherent in CM by providing a new intelligent layer that enhances classical approaches to construction modelling and management. It investigates how the myriad types of internal and external factors affecting the feasibility and performance of construction projects can be modelled using a fuzzy hybrid method that explores the complex relationships among many contributing factors and assesses and evaluates their impacts on past and future projects. This chapter proposes a hybrid modelling approach in the traditional context of cost, schedule and risk management and describes how augmenting and enhancing existing state-of-the-art tools and processes in CM can assist construction managers. This chapter provides a background on the theory of FCMs, presents foundational and current research, and explains how to apply this approach in the CM domain. This chapter also provides a detailed description of how to develop, modify and employ interactive models to specific CM challenges and problems. It includes a customisable, interactive base model and demonstrates how the model has been applied to specific CM events and issues. Examples are presented that highlight the interplay between project-specific goals and characteristics and the way these impact the interrelated and often opposing triad of cost, schedule and risk. The presented examples and practical applications make this state-of-the-art approach useful to both academic and industry practitioners.","PeriodicalId":301967,"journal":{"name":"Fuzzy Hybrid Computing in Construction Engineering and Management","volume":"102 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-10-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":"{\"title\":\"Modelling Construction Management Problems with Fuzzy Cognitive Maps\",\"authors\":\"Denise M. Case, T. Blackburn, C. Stylios\",\"doi\":\"10.1108/978-1-78743-868-220181012\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract \\nThis chapter discusses the application of fuzzy cognitive map (FCM) modelling to construction management (CM) challenges and problems. It focuses on the critical issue of managing the complexity and uncertainty inherent in CM by providing a new intelligent layer that enhances classical approaches to construction modelling and management. It investigates how the myriad types of internal and external factors affecting the feasibility and performance of construction projects can be modelled using a fuzzy hybrid method that explores the complex relationships among many contributing factors and assesses and evaluates their impacts on past and future projects. This chapter proposes a hybrid modelling approach in the traditional context of cost, schedule and risk management and describes how augmenting and enhancing existing state-of-the-art tools and processes in CM can assist construction managers. This chapter provides a background on the theory of FCMs, presents foundational and current research, and explains how to apply this approach in the CM domain. This chapter also provides a detailed description of how to develop, modify and employ interactive models to specific CM challenges and problems. It includes a customisable, interactive base model and demonstrates how the model has been applied to specific CM events and issues. Examples are presented that highlight the interplay between project-specific goals and characteristics and the way these impact the interrelated and often opposing triad of cost, schedule and risk. The presented examples and practical applications make this state-of-the-art approach useful to both academic and industry practitioners.\",\"PeriodicalId\":301967,\"journal\":{\"name\":\"Fuzzy Hybrid Computing in Construction Engineering and Management\",\"volume\":\"102 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-10-04\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"5\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Fuzzy Hybrid Computing in Construction Engineering and Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1108/978-1-78743-868-220181012\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Fuzzy Hybrid Computing in Construction Engineering and Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/978-1-78743-868-220181012","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Modelling Construction Management Problems with Fuzzy Cognitive Maps
Abstract
This chapter discusses the application of fuzzy cognitive map (FCM) modelling to construction management (CM) challenges and problems. It focuses on the critical issue of managing the complexity and uncertainty inherent in CM by providing a new intelligent layer that enhances classical approaches to construction modelling and management. It investigates how the myriad types of internal and external factors affecting the feasibility and performance of construction projects can be modelled using a fuzzy hybrid method that explores the complex relationships among many contributing factors and assesses and evaluates their impacts on past and future projects. This chapter proposes a hybrid modelling approach in the traditional context of cost, schedule and risk management and describes how augmenting and enhancing existing state-of-the-art tools and processes in CM can assist construction managers. This chapter provides a background on the theory of FCMs, presents foundational and current research, and explains how to apply this approach in the CM domain. This chapter also provides a detailed description of how to develop, modify and employ interactive models to specific CM challenges and problems. It includes a customisable, interactive base model and demonstrates how the model has been applied to specific CM events and issues. Examples are presented that highlight the interplay between project-specific goals and characteristics and the way these impact the interrelated and often opposing triad of cost, schedule and risk. The presented examples and practical applications make this state-of-the-art approach useful to both academic and industry practitioners.