{"title":"NYISO和ISO-NE的容量市场","authors":"H. Chao","doi":"10.1109/PES.2007.386277","DOIUrl":null,"url":null,"abstract":"Electricity market demand is increasing by 1.5 - 2.0% per year. With demand rising and older power plants retiring, the need for power supply in the North Americas, in general, is becoming critical. This is especially true in the Northeast part of the US. While much discussions and regulatory filings have been done, an effective formation of the capacity market is still in the making. A review of the capacity market and resource deliverability in the Northeast, the mechanism of the capacity markets, the pros and cons, and how they are supposedly to work will be discussed.","PeriodicalId":380613,"journal":{"name":"2007 IEEE Power Engineering Society General Meeting","volume":"45 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2007-06-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Capacity Markets in NYISO & ISO-NE\",\"authors\":\"H. Chao\",\"doi\":\"10.1109/PES.2007.386277\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Electricity market demand is increasing by 1.5 - 2.0% per year. With demand rising and older power plants retiring, the need for power supply in the North Americas, in general, is becoming critical. This is especially true in the Northeast part of the US. While much discussions and regulatory filings have been done, an effective formation of the capacity market is still in the making. A review of the capacity market and resource deliverability in the Northeast, the mechanism of the capacity markets, the pros and cons, and how they are supposedly to work will be discussed.\",\"PeriodicalId\":380613,\"journal\":{\"name\":\"2007 IEEE Power Engineering Society General Meeting\",\"volume\":\"45 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2007-06-24\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2007 IEEE Power Engineering Society General Meeting\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PES.2007.386277\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2007 IEEE Power Engineering Society General Meeting","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PES.2007.386277","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

电力市场需求以每年1.5 - 2.0%的速度增长。随着需求的上升和老旧电厂的退役,总的来说,北美对电力供应的需求正变得至关重要。在美国东北部尤其如此。虽然已经进行了大量的讨论并提交了监管文件,但有效的产能市场形成仍在进行中。本文将对东北地区的容量市场和资源可交付性、容量市场的机制、利弊以及如何运作进行讨论。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Capacity Markets in NYISO & ISO-NE
Electricity market demand is increasing by 1.5 - 2.0% per year. With demand rising and older power plants retiring, the need for power supply in the North Americas, in general, is becoming critical. This is especially true in the Northeast part of the US. While much discussions and regulatory filings have been done, an effective formation of the capacity market is still in the making. A review of the capacity market and resource deliverability in the Northeast, the mechanism of the capacity markets, the pros and cons, and how they are supposedly to work will be discussed.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
A Panel on Infrastructures for Enabling Sustainable Energy Technologies Electric Industry Infrastructure for Sustainability: Climate Change and Energy Storage Sulfur Hexafluoride SF6 Proactive Reliability Management using almost Real-Time Outage Data Utilizing Real-Time Outage Data for External and Internal Reporting
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1