狮子洋大桥-大直径主缆

Jakub Duris, J. Marcussen, Assad Jamal, Jesper Pihl
{"title":"狮子洋大桥-大直径主缆","authors":"Jakub Duris, J. Marcussen, Assad Jamal, Jesper Pihl","doi":"10.2749/nanjing.2022.0117","DOIUrl":null,"url":null,"abstract":"The ShiZiYang suspension bridge in the GuangDong province in China will when constructed have a world record main span of 2180 m and carry an impressive 2 x 8 lanes of traffic on the two levels truss girder.Due to its size, ShiZiYang bridge requires extensive main cable area with diameter nearly 1.5 m representing the largest main cable ever constructed. An option of dual main cables can be considered with smaller main cables including simpler compaction. However the construction time is extended, all adjacent structures such as saddles, anchorages and cable clamps become significantly more complex and the separate cables behave as independent members.The paper discusses the main key challenges regarding design and construction of large main cables with diameter above 1m and alternatively dual main cables.","PeriodicalId":410450,"journal":{"name":"IABSE Congress, Nanjing 2022: Bridges and Structures: Connection, Integration and Harmonisation","volume":"32 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"ShiZiYang Bridge – Large diameter main cables\",\"authors\":\"Jakub Duris, J. Marcussen, Assad Jamal, Jesper Pihl\",\"doi\":\"10.2749/nanjing.2022.0117\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The ShiZiYang suspension bridge in the GuangDong province in China will when constructed have a world record main span of 2180 m and carry an impressive 2 x 8 lanes of traffic on the two levels truss girder.Due to its size, ShiZiYang bridge requires extensive main cable area with diameter nearly 1.5 m representing the largest main cable ever constructed. An option of dual main cables can be considered with smaller main cables including simpler compaction. However the construction time is extended, all adjacent structures such as saddles, anchorages and cable clamps become significantly more complex and the separate cables behave as independent members.The paper discusses the main key challenges regarding design and construction of large main cables with diameter above 1m and alternatively dual main cables.\",\"PeriodicalId\":410450,\"journal\":{\"name\":\"IABSE Congress, Nanjing 2022: Bridges and Structures: Connection, Integration and Harmonisation\",\"volume\":\"32 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IABSE Congress, Nanjing 2022: Bridges and Structures: Connection, Integration and Harmonisation\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2749/nanjing.2022.0117\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IABSE Congress, Nanjing 2022: Bridges and Structures: Connection, Integration and Harmonisation","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2749/nanjing.2022.0117","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

位于中国广东省的狮子洋悬索桥建成后,主跨将达到世界纪录的2180米,在两层桁架梁上承载令人印象深刻的2 × 8车道交通。由于其规模,狮子洋大桥需要广泛的主缆面积,直径近1.5米,是迄今为止建造的最大的主缆。可以考虑双主电缆的选择,使用较小的主电缆,包括更简单的压实。然而,随着施工时间的延长,所有相邻的结构,如鞍座、锚固和索夹变得更加复杂,单独的索表现为独立的构件。本文讨论了直径大于1m的大型主缆和双主缆交替设计与施工的主要关键问题。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
ShiZiYang Bridge – Large diameter main cables
The ShiZiYang suspension bridge in the GuangDong province in China will when constructed have a world record main span of 2180 m and carry an impressive 2 x 8 lanes of traffic on the two levels truss girder.Due to its size, ShiZiYang bridge requires extensive main cable area with diameter nearly 1.5 m representing the largest main cable ever constructed. An option of dual main cables can be considered with smaller main cables including simpler compaction. However the construction time is extended, all adjacent structures such as saddles, anchorages and cable clamps become significantly more complex and the separate cables behave as independent members.The paper discusses the main key challenges regarding design and construction of large main cables with diameter above 1m and alternatively dual main cables.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
FE Modeling of the Interfacial Behaviour of Precast Multi-box Girder The Behavior of Long-span Suspended Footbridge Under Wind Load The Durability and SHM System of Hong Kong-Zhuhai-Macao Bridge Study on the Influence of Bridge Expansion Joints on Vehicle-Track- Bridge System Numerical Examination in Bridge Responses due to Fracture of Truss Member in a Steel Truss Bridge under Vehicle Loadings
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1