考虑DG协调控制和运行风险限制的孤岛运行时长评估

T. Xiao, Z. Rao, Haojun Zhu, Ying-hong Jiang
{"title":"考虑DG协调控制和运行风险限制的孤岛运行时长评估","authors":"T. Xiao, Z. Rao, Haojun Zhu, Ying-hong Jiang","doi":"10.1109/ACPEE51499.2021.9436972","DOIUrl":null,"url":null,"abstract":"The operation duration of isolated island formed after fault is an important indicator of the operation ability. In this paper, a novel bi-level mixed-integer nonlinear model is proposed to evaluate the maximum operation duration of isolated island with fully consideration of the uncertainties of the wind turbines (WTs), the photovoltaics (PVs) and the load. Besides, risk limitation and the control strategies of distributed generators (DGs) and distributed energy resources (DERs) are also considered. The modified IEEE 33-bus power system with a certain penetration of WTs and PVs is employed to validate the proposed method. The simulation results indicate that the proposed model can evaluate the system’s operation duration more realistic, and improve the credibility of the evaluation results.","PeriodicalId":127882,"journal":{"name":"2021 6th Asia Conference on Power and Electrical Engineering (ACPEE)","volume":"53 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Operation Duration Assessment of Isolated Island Considering DG Coordinated Control and Operation Risk Limitations\",\"authors\":\"T. Xiao, Z. Rao, Haojun Zhu, Ying-hong Jiang\",\"doi\":\"10.1109/ACPEE51499.2021.9436972\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The operation duration of isolated island formed after fault is an important indicator of the operation ability. In this paper, a novel bi-level mixed-integer nonlinear model is proposed to evaluate the maximum operation duration of isolated island with fully consideration of the uncertainties of the wind turbines (WTs), the photovoltaics (PVs) and the load. Besides, risk limitation and the control strategies of distributed generators (DGs) and distributed energy resources (DERs) are also considered. The modified IEEE 33-bus power system with a certain penetration of WTs and PVs is employed to validate the proposed method. The simulation results indicate that the proposed model can evaluate the system’s operation duration more realistic, and improve the credibility of the evaluation results.\",\"PeriodicalId\":127882,\"journal\":{\"name\":\"2021 6th Asia Conference on Power and Electrical Engineering (ACPEE)\",\"volume\":\"53 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-04-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2021 6th Asia Conference on Power and Electrical Engineering (ACPEE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ACPEE51499.2021.9436972\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 6th Asia Conference on Power and Electrical Engineering (ACPEE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ACPEE51499.2021.9436972","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

故障后形成的孤岛运行时间是衡量运行能力的重要指标。本文在充分考虑风力发电机组、光伏发电机组和负荷不确定性的情况下,提出了一种新的孤岛最大运行时长的双水平混合整数非线性模型。此外,还考虑了分布式发电机和分布式能源的风险限制和控制策略。采用改进的IEEE 33总线电源系统,对WTs和pv进行了一定的穿透,验证了所提出的方法。仿真结果表明,该模型能更真实地评估系统运行时间,提高了评估结果的可信度。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Operation Duration Assessment of Isolated Island Considering DG Coordinated Control and Operation Risk Limitations
The operation duration of isolated island formed after fault is an important indicator of the operation ability. In this paper, a novel bi-level mixed-integer nonlinear model is proposed to evaluate the maximum operation duration of isolated island with fully consideration of the uncertainties of the wind turbines (WTs), the photovoltaics (PVs) and the load. Besides, risk limitation and the control strategies of distributed generators (DGs) and distributed energy resources (DERs) are also considered. The modified IEEE 33-bus power system with a certain penetration of WTs and PVs is employed to validate the proposed method. The simulation results indicate that the proposed model can evaluate the system’s operation duration more realistic, and improve the credibility of the evaluation results.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Transient Stability Emergency Control Based on Real-time Power Angle Trajectory Fitting Topology Identification Method for Primary Distribution Network with Limited Smart Meter Data The Steady State Limits Application of 18-pulse Rectifier in Aircraft Radar Power Supply System Yardstick motivation evaluation method for investment of distribution network A Power and Load Optimization Scheduling Model based on Flexible Thermal Load Participating in Assisted Peak Regulation
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1