{"title":"根据雇佣合同,东爪哇省建筑项目延迟的案例研究","authors":"Lilian Arlista Ayu","doi":"10.31090/njts.v2i2.698","DOIUrl":null,"url":null,"abstract":"The development of increasing infrastructure development gave birth to the rapid development of service companies engaged in construction. Delay is one of the obstacles to development because the completion time does not match the one specified in the employment contract document. \nThe delay in the construction project means the increase in the timing of the completion of the planned project and is contained in the contract documents agreed by both parties, namely the first and second parties. This study is to look for factors that affect the delays of construction projects, identify the role of legislation, and identify contracts. \nThis research method is qualitative that is by observation and interview with resource person from Dinas Pekerjaan Umum Dan Tata Ruang that is PPK and staff. Also speakers from private contractors are supervisors, structural estimators, and some staff. \nOn the scope of Government projects, the three dominant factors that affect the construction project's delays are weather, labor, and design. On the scope of Private projects, the three dominant factors that affect construction project delays are weather, material, and finance. The laws governing the delay are Law No.2 / 2017 article 54 paragraph (1) and (2), Perpres No.54 / 2010 Jo Perpres No.35 / 2011 Jo Perpres No.70 / 2012 and LKPP No.14 / 2012. The clause on the delay in the government work contract is in the SSUK, namely the critical contract, the term SSKK, and the bank's guarantee. Clauses on Private contracts namely the breach of wanprestasi and sanctions, and bank guarantees.","PeriodicalId":347209,"journal":{"name":"NAROTAMA JURNAL TEKNIK SIPIL","volume":"37 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-11-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"STUDI KASUS KETERLAMBATAN PROYEK KONSTRUKSI DI PROVINSI JAWA TIMUR BERDASARKAN KONTRAK KERJA\",\"authors\":\"Lilian Arlista Ayu\",\"doi\":\"10.31090/njts.v2i2.698\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The development of increasing infrastructure development gave birth to the rapid development of service companies engaged in construction. Delay is one of the obstacles to development because the completion time does not match the one specified in the employment contract document. \\nThe delay in the construction project means the increase in the timing of the completion of the planned project and is contained in the contract documents agreed by both parties, namely the first and second parties. This study is to look for factors that affect the delays of construction projects, identify the role of legislation, and identify contracts. \\nThis research method is qualitative that is by observation and interview with resource person from Dinas Pekerjaan Umum Dan Tata Ruang that is PPK and staff. Also speakers from private contractors are supervisors, structural estimators, and some staff. \\nOn the scope of Government projects, the three dominant factors that affect the construction project's delays are weather, labor, and design. On the scope of Private projects, the three dominant factors that affect construction project delays are weather, material, and finance. The laws governing the delay are Law No.2 / 2017 article 54 paragraph (1) and (2), Perpres No.54 / 2010 Jo Perpres No.35 / 2011 Jo Perpres No.70 / 2012 and LKPP No.14 / 2012. The clause on the delay in the government work contract is in the SSUK, namely the critical contract, the term SSKK, and the bank's guarantee. Clauses on Private contracts namely the breach of wanprestasi and sanctions, and bank guarantees.\",\"PeriodicalId\":347209,\"journal\":{\"name\":\"NAROTAMA JURNAL TEKNIK SIPIL\",\"volume\":\"37 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-11-08\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"NAROTAMA JURNAL TEKNIK SIPIL\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.31090/njts.v2i2.698\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"NAROTAMA JURNAL TEKNIK SIPIL","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31090/njts.v2i2.698","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

摘要

随着我国基础设施建设的不断发展,从事建筑施工的服务企业也迅速发展起来。由于完成时间与雇佣合同文件中规定的时间不符,延误是发展的障碍之一。施工项目的延迟是指计划工程完成时间的增加,并包含在双方即第一方和第二方约定的合同文件中。本研究旨在寻找影响建设项目延迟的因素,确定立法的作用,并确定合同。本研究方法是定性的,即通过观察和采访来自Dinas Pekerjaan Umum Dan Tata Ruang的资源人员和工作人员。来自私人承包商的发言者还有主管、结构估算员和一些员工。在政府项目的范围内,影响建设项目延误的三个主要因素是天气、劳动力和设计。在私人项目的范围内,影响建设项目延迟的三个主要因素是天气、材料和资金。有关延迟的法律是第2号法律/ 2017条第54(1)和(2)款,第54 / 2010号Perpres第35 / 2011号Jo Perpres第70 / 2012号和LKPP第14 / 2012号。政府工程合同延期条款在SSUK中,即关键合同,期限SSKK,银行担保。关于私人合同的条款,即违反禁令和制裁,以及银行担保。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
STUDI KASUS KETERLAMBATAN PROYEK KONSTRUKSI DI PROVINSI JAWA TIMUR BERDASARKAN KONTRAK KERJA
The development of increasing infrastructure development gave birth to the rapid development of service companies engaged in construction. Delay is one of the obstacles to development because the completion time does not match the one specified in the employment contract document. The delay in the construction project means the increase in the timing of the completion of the planned project and is contained in the contract documents agreed by both parties, namely the first and second parties. This study is to look for factors that affect the delays of construction projects, identify the role of legislation, and identify contracts. This research method is qualitative that is by observation and interview with resource person from Dinas Pekerjaan Umum Dan Tata Ruang that is PPK and staff. Also speakers from private contractors are supervisors, structural estimators, and some staff. On the scope of Government projects, the three dominant factors that affect the construction project's delays are weather, labor, and design. On the scope of Private projects, the three dominant factors that affect construction project delays are weather, material, and finance. The laws governing the delay are Law No.2 / 2017 article 54 paragraph (1) and (2), Perpres No.54 / 2010 Jo Perpres No.35 / 2011 Jo Perpres No.70 / 2012 and LKPP No.14 / 2012. The clause on the delay in the government work contract is in the SSUK, namely the critical contract, the term SSKK, and the bank's guarantee. Clauses on Private contracts namely the breach of wanprestasi and sanctions, and bank guarantees.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
PENGOLAHAN AIR LIMBAH DENGAN SISTEM REAKTOR ANAEROBIK BERSEKAT (SRAB) INDIKATOR-INDIKATOR YANG MEMPENGARUHI STRES KERJA TERHADAP KESELAMATAN DAN KESEHATAN KERJA (K3) PERENCANAAN SISTEM DRAINASE PERUMAHAN GRAND KENJERAN DENGAN PRINSIP ZERO DELTA Q PENGARUH CAMPURAN ABU TEMPURUNG KELAPA DAN SEMEN PORTLAND TERHADAP DAYA DUKUNG DAN KUAT GESER TANAH LEMPUNG PENGARUH PENAMBAHAN SERAT KARUNG PLASTIK PADA TANAH LEMPUNG TERHADAP UJI CBR
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1