H. Mosadegh, E. Khakbazan, A. Salmasnia, H. Mokhtari
{"title":"求解不确定总体生产计划问题的模糊多目标规划模型","authors":"H. Mosadegh, E. Khakbazan, A. Salmasnia, H. Mokhtari","doi":"10.1504/IJIDS.2017.10005871","DOIUrl":null,"url":null,"abstract":"The aggregate production planning problem is one of the well-known planning problems in industries and manufacturing systems. It is implemented at an aggregated level without the need to provide detailed information about material and resource requirements for individual products. A multi-objective aggregate production planning problem is studied in current paper with four criteria, namely: 1) shortage and inventory; 2) overtime and idle time; 3) manpower level; 4) currency saving in a mid-term planning horizon. After describing the problem, a goal programming model is presented to formulate the problem mathematically and then a fuzzy goal programming model is utilised to encounter the uncertainties encountered in real-world systems. Unlike many previous works, this paper proposes a linear programming model which is solvable in a short time. Finally, to evaluate the performance, both models are verified with real data.","PeriodicalId":303039,"journal":{"name":"Int. J. Inf. Decis. Sci.","volume":"26 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-07-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"11","resultStr":"{\"title\":\"A fuzzy multi-objective goal programming model for solving an aggregate production planning problem with uncertainty\",\"authors\":\"H. Mosadegh, E. Khakbazan, A. Salmasnia, H. Mokhtari\",\"doi\":\"10.1504/IJIDS.2017.10005871\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The aggregate production planning problem is one of the well-known planning problems in industries and manufacturing systems. It is implemented at an aggregated level without the need to provide detailed information about material and resource requirements for individual products. A multi-objective aggregate production planning problem is studied in current paper with four criteria, namely: 1) shortage and inventory; 2) overtime and idle time; 3) manpower level; 4) currency saving in a mid-term planning horizon. After describing the problem, a goal programming model is presented to formulate the problem mathematically and then a fuzzy goal programming model is utilised to encounter the uncertainties encountered in real-world systems. Unlike many previous works, this paper proposes a linear programming model which is solvable in a short time. Finally, to evaluate the performance, both models are verified with real data.\",\"PeriodicalId\":303039,\"journal\":{\"name\":\"Int. J. Inf. Decis. Sci.\",\"volume\":\"26 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2017-07-12\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"11\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Int. J. Inf. Decis. Sci.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1504/IJIDS.2017.10005871\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Int. J. Inf. Decis. Sci.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1504/IJIDS.2017.10005871","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
A fuzzy multi-objective goal programming model for solving an aggregate production planning problem with uncertainty
The aggregate production planning problem is one of the well-known planning problems in industries and manufacturing systems. It is implemented at an aggregated level without the need to provide detailed information about material and resource requirements for individual products. A multi-objective aggregate production planning problem is studied in current paper with four criteria, namely: 1) shortage and inventory; 2) overtime and idle time; 3) manpower level; 4) currency saving in a mid-term planning horizon. After describing the problem, a goal programming model is presented to formulate the problem mathematically and then a fuzzy goal programming model is utilised to encounter the uncertainties encountered in real-world systems. Unlike many previous works, this paper proposes a linear programming model which is solvable in a short time. Finally, to evaluate the performance, both models are verified with real data.