{"title":"我的UPS配送系统是否协调?","authors":"R. Cosse, D. Dunn, R. Spiewak","doi":"10.1109/PCICON.2004.1352786","DOIUrl":null,"url":null,"abstract":"Typical petroleum and chemical industry UPS (uninterruptible power supply) distribution systems are reviewed for interrupting device selectivity during short-circuit conditions. When selectivity is not achieved, alternative solutions are proposed. Distribution system selectivity comparisons are performed for standard circuit breaker panelboards, fuse panelboards and custom panelboards utilizing hydraulic-magnetic circuit breakers. When remote panels are implemented, application considerations include oversizing feeder cables or using step-up/step-down transformers. To determine the \"ride through\" response of individual operating plant UPS loads, the voltage depression time during UPS distribution system fault clearing is compared with the load \"ride through\" capability. General guidelines are provided for improved UPS distribution system performance","PeriodicalId":231751,"journal":{"name":"Conference Record of 2006 Annual Pulp and Paper Industry Technical Conference","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2004-09-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Is My UPS Distribution System Coordinated?\",\"authors\":\"R. Cosse, D. Dunn, R. Spiewak\",\"doi\":\"10.1109/PCICON.2004.1352786\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Typical petroleum and chemical industry UPS (uninterruptible power supply) distribution systems are reviewed for interrupting device selectivity during short-circuit conditions. When selectivity is not achieved, alternative solutions are proposed. Distribution system selectivity comparisons are performed for standard circuit breaker panelboards, fuse panelboards and custom panelboards utilizing hydraulic-magnetic circuit breakers. When remote panels are implemented, application considerations include oversizing feeder cables or using step-up/step-down transformers. To determine the \\\"ride through\\\" response of individual operating plant UPS loads, the voltage depression time during UPS distribution system fault clearing is compared with the load \\\"ride through\\\" capability. General guidelines are provided for improved UPS distribution system performance\",\"PeriodicalId\":231751,\"journal\":{\"name\":\"Conference Record of 2006 Annual Pulp and Paper Industry Technical Conference\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2004-09-13\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Conference Record of 2006 Annual Pulp and Paper Industry Technical Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PCICON.2004.1352786\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Conference Record of 2006 Annual Pulp and Paper Industry Technical Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PCICON.2004.1352786","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

对典型的石油和化工不间断电源配电系统在短路条件下的中断装置选择性进行了综述。当不能达到选择性时,提出替代解决方案。配电系统的选择性比较执行标准断路器面板,熔断器面板和定制面板使用液压磁断路器。当实现远程面板时,应用考虑包括超大馈线电缆或使用升压/降压变压器。为了确定各运行厂UPS负载的“穿越”响应,将UPS配电系统故障清除过程中的电压下降时间与负载的“穿越”能力进行了比较。提供了改进UPS配电系统性能的一般指南
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Is My UPS Distribution System Coordinated?
Typical petroleum and chemical industry UPS (uninterruptible power supply) distribution systems are reviewed for interrupting device selectivity during short-circuit conditions. When selectivity is not achieved, alternative solutions are proposed. Distribution system selectivity comparisons are performed for standard circuit breaker panelboards, fuse panelboards and custom panelboards utilizing hydraulic-magnetic circuit breakers. When remote panels are implemented, application considerations include oversizing feeder cables or using step-up/step-down transformers. To determine the "ride through" response of individual operating plant UPS loads, the voltage depression time during UPS distribution system fault clearing is compared with the load "ride through" capability. General guidelines are provided for improved UPS distribution system performance
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Real-Time Web-Based System Monitoring Effects of Power Quality Distortions on Electrical Drives and Transformer Life in Paper Industries: Simulations and Real Time Measurements Line Shaft Experience with Partial Sectionalization of a Paper Machine Use of Instantaneous Trip Functions and Current Limiting Fuses to Reduce Arc Flash Energy Arc Flash Hazard Calculations: Myths, Facts and Solutions
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1