战时英国的电网系统

J. Hacking, J. Peattie
{"title":"战时英国的电网系统","authors":"J. Hacking, J. Peattie","doi":"10.1049/JI-2.1947.0127","DOIUrl":null,"url":null,"abstract":"The paper describes the pre-war preparations, such as operating procedure, provision of an alternative control organization, protection of plant and the national pool of spares. The action taken on outbreak of war is outlined and the subsequent experience of the war years is surveyed in greater detail. Reference is made to change in the magnitude and distribution of loads and the resulting problems in the provision of generating capacity to supply these loads. The problems of plant availability, fuel supplies and war damage are discussed. The paper closes with an account of the development of the transmission system and the various classes of faults arising out of the war. It is divided into the following Sections. 1) Introduction. 2) Precautionary Measures 1936?1939. 3) Action on Outbreak of War. 4) Changes in Load and Generating-Plant Capacity during the War. 5) Transmission System during the War. 6) Conclusion.","PeriodicalId":307627,"journal":{"name":"Journal of the Institution of Electrical Engineers - Part II: Power Engineering","volume":"75 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1947-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"The British grid system in war time\",\"authors\":\"J. Hacking, J. Peattie\",\"doi\":\"10.1049/JI-2.1947.0127\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The paper describes the pre-war preparations, such as operating procedure, provision of an alternative control organization, protection of plant and the national pool of spares. The action taken on outbreak of war is outlined and the subsequent experience of the war years is surveyed in greater detail. Reference is made to change in the magnitude and distribution of loads and the resulting problems in the provision of generating capacity to supply these loads. The problems of plant availability, fuel supplies and war damage are discussed. The paper closes with an account of the development of the transmission system and the various classes of faults arising out of the war. It is divided into the following Sections. 1) Introduction. 2) Precautionary Measures 1936?1939. 3) Action on Outbreak of War. 4) Changes in Load and Generating-Plant Capacity during the War. 5) Transmission System during the War. 6) Conclusion.\",\"PeriodicalId\":307627,\"journal\":{\"name\":\"Journal of the Institution of Electrical Engineers - Part II: Power Engineering\",\"volume\":\"75 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1947-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of the Institution of Electrical Engineers - Part II: Power Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1049/JI-2.1947.0127\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of the Institution of Electrical Engineers - Part II: Power Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1049/JI-2.1947.0127","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

本文介绍了战前准备工作,如操作程序、提供替代控制机构、工厂保护和国家备件库。概述了战争爆发时所采取的行动,并更详细地考察了战争年代的后续经验。文中提到了负荷的大小和分布的变化,以及由此产生的为这些负荷提供发电能力的问题。讨论了工厂可用性、燃料供应和战损等问题。论文最后叙述了输电系统的发展和战争引起的各种故障。它分为以下几部分:1)引言。2)预防措施1936 - 1939。3)战争爆发时的行动。4)战争时期负荷和发电能力的变化。5)战争时期的输电系统。6)结论。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
The British grid system in war time
The paper describes the pre-war preparations, such as operating procedure, provision of an alternative control organization, protection of plant and the national pool of spares. The action taken on outbreak of war is outlined and the subsequent experience of the war years is surveyed in greater detail. Reference is made to change in the magnitude and distribution of loads and the resulting problems in the provision of generating capacity to supply these loads. The problems of plant availability, fuel supplies and war damage are discussed. The paper closes with an account of the development of the transmission system and the various classes of faults arising out of the war. It is divided into the following Sections. 1) Introduction. 2) Precautionary Measures 1936?1939. 3) Action on Outbreak of War. 4) Changes in Load and Generating-Plant Capacity during the War. 5) Transmission System during the War. 6) Conclusion.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
The flash tube and its applications Corrigendum: The predetermination of the magnetic properties of ferromagnetic laminae at power and audio frequencies The authors' replies to the discussion on "Development of locators of small metallic bodies buried in the ground" Development of locators of small metallic bodies buried in the ground Transformer economic efficiency
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1