COVID-19大流行对硬件零售供应链的影响建模

A. Sathyanarayana, N. Shukla, F. Taghikhah
{"title":"COVID-19大流行对硬件零售供应链的影响建模","authors":"A. Sathyanarayana, N. Shukla, F. Taghikhah","doi":"10.1109/IEEM45057.2020.9309973","DOIUrl":null,"url":null,"abstract":"Due to the current COVID-19 (SARS-CoV-2) outbreak, supply chains have been severely disrupted in long term globally. In this paper, we present the results of a simulation study conducted on a case of the global supply chain. We have discussed the impact of COVID19 on the supply chains by citing some recent examples in the retail sector in Australia. We demonstrate the use of simulation modelling to quickly and reliably model and analyze supply chain disruptions through the use of anyLogistix simulation software. In this paper, we have simulated a case of an Australian hardware retail supply chain that has a global supply network. We have investigated the impact of COVID19 disruptions on the supply chain performance. Our results highlighted the importance of waiting order cancellation strategy in the recovery period for reducing supply chain costs and maintaining service level. We also discussed the negative effect of distance between supplier and customer on the resiliency of delivery systems. This initial work was a proof of concept to simulate COVID19 disruptions on a retail supply chain.","PeriodicalId":226426,"journal":{"name":"2020 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2020-12-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"11","resultStr":"{\"title\":\"Modelling the Impact of COVID-19 Pandemic on a Hardware Retail Supply Chain\",\"authors\":\"A. Sathyanarayana, N. Shukla, F. Taghikhah\",\"doi\":\"10.1109/IEEM45057.2020.9309973\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Due to the current COVID-19 (SARS-CoV-2) outbreak, supply chains have been severely disrupted in long term globally. In this paper, we present the results of a simulation study conducted on a case of the global supply chain. We have discussed the impact of COVID19 on the supply chains by citing some recent examples in the retail sector in Australia. We demonstrate the use of simulation modelling to quickly and reliably model and analyze supply chain disruptions through the use of anyLogistix simulation software. In this paper, we have simulated a case of an Australian hardware retail supply chain that has a global supply network. We have investigated the impact of COVID19 disruptions on the supply chain performance. Our results highlighted the importance of waiting order cancellation strategy in the recovery period for reducing supply chain costs and maintaining service level. We also discussed the negative effect of distance between supplier and customer on the resiliency of delivery systems. This initial work was a proof of concept to simulate COVID19 disruptions on a retail supply chain.\",\"PeriodicalId\":226426,\"journal\":{\"name\":\"2020 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-12-14\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"11\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2020 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IEEM45057.2020.9309973\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEEM45057.2020.9309973","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 11

摘要

由于当前的COVID-19 (SARS-CoV-2)爆发,全球供应链长期严重中断。在本文中,我们提出了对全球供应链案例进行模拟研究的结果。我们以最近澳大利亚零售业的一些例子为例,讨论了新冠肺炎对供应链的影响。我们通过使用anyLogistix仿真软件演示了如何使用仿真建模来快速可靠地建模和分析供应链中断。在本文中,我们模拟了一个具有全球供应网络的澳大利亚硬件零售供应链的案例。我们调查了covid - 19中断对供应链绩效的影响。我们的研究结果强调了在恢复期等待订单取消策略对于降低供应链成本和维持服务水平的重要性。我们还讨论了供应商和客户之间的距离对交付系统弹性的负面影响。这项初步工作是模拟covid - 19对零售供应链中断的概念验证。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Modelling the Impact of COVID-19 Pandemic on a Hardware Retail Supply Chain
Due to the current COVID-19 (SARS-CoV-2) outbreak, supply chains have been severely disrupted in long term globally. In this paper, we present the results of a simulation study conducted on a case of the global supply chain. We have discussed the impact of COVID19 on the supply chains by citing some recent examples in the retail sector in Australia. We demonstrate the use of simulation modelling to quickly and reliably model and analyze supply chain disruptions through the use of anyLogistix simulation software. In this paper, we have simulated a case of an Australian hardware retail supply chain that has a global supply network. We have investigated the impact of COVID19 disruptions on the supply chain performance. Our results highlighted the importance of waiting order cancellation strategy in the recovery period for reducing supply chain costs and maintaining service level. We also discussed the negative effect of distance between supplier and customer on the resiliency of delivery systems. This initial work was a proof of concept to simulate COVID19 disruptions on a retail supply chain.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
An Inventory Optimization Model Under Demand Uncertainty for Autonomous Multi-site Inventory Planning with Material Substitutability and Transshipment Sustainability Assessment of Contract Farming Broiler Chicken Supply Chain Using Rap-Poultry Concept Design of a System Architecture for a Manufacturing Cyber-physical Digital Twin System Robust Optimization Based Heuristic Approach for Solving Stochastic Multi-Mode Resource Constrained Project Scheduling Problem Bi-objective Multistage Decentralized Supply Chain Planning
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1