使用寿命和供应商绩效对医疗设备更换决策的影响

B. K. Ouda, N. Saleh, A. Mohamed
{"title":"使用寿命和供应商绩效对医疗设备更换决策的影响","authors":"B. K. Ouda, N. Saleh, A. Mohamed","doi":"10.1109/CIBEC.2012.6473324","DOIUrl":null,"url":null,"abstract":"Medical equipment management life cycle considers various stages ranging from planning to disposal or replacement. Replacement decision is critical and essential stage of medical equipment. A variety of criteria contributes to make an intelligent replacement decision. We enhance the Fault Tree Analysis (FTA) model for replacement of medical equipment, considering a combination of technical, financial, and safety criteria. The considered criteria are; hazard and alerts, cost, useful life, and vendor support. Throughout this model, we classify medical equipment life status into four groups; replacement, test, surveillance and keep. According to the final event score, the replacement decision is approved or not. Neonatal Intensive Care Unit (NICU) equipment of 12 different types for 3 hospitals, along three years, is utilized to investigate the proposed model. Our model proposes a priority list of equipment that should be replaced. According to the analysis to the proposed factors, the useful life factor is found to be the dominant factor. In addition, a high correlation between vendor performance and expended costs is realized.","PeriodicalId":416740,"journal":{"name":"2012 Cairo International Biomedical Engineering Conference (CIBEC)","volume":"102 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2012-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"9","resultStr":"{\"title\":\"The effect of useful life and vendor performance on replacement decision of medical equipment\",\"authors\":\"B. K. Ouda, N. Saleh, A. Mohamed\",\"doi\":\"10.1109/CIBEC.2012.6473324\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Medical equipment management life cycle considers various stages ranging from planning to disposal or replacement. Replacement decision is critical and essential stage of medical equipment. A variety of criteria contributes to make an intelligent replacement decision. We enhance the Fault Tree Analysis (FTA) model for replacement of medical equipment, considering a combination of technical, financial, and safety criteria. The considered criteria are; hazard and alerts, cost, useful life, and vendor support. Throughout this model, we classify medical equipment life status into four groups; replacement, test, surveillance and keep. According to the final event score, the replacement decision is approved or not. Neonatal Intensive Care Unit (NICU) equipment of 12 different types for 3 hospitals, along three years, is utilized to investigate the proposed model. Our model proposes a priority list of equipment that should be replaced. According to the analysis to the proposed factors, the useful life factor is found to be the dominant factor. In addition, a high correlation between vendor performance and expended costs is realized.\",\"PeriodicalId\":416740,\"journal\":{\"name\":\"2012 Cairo International Biomedical Engineering Conference (CIBEC)\",\"volume\":\"102 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2012-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"9\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2012 Cairo International Biomedical Engineering Conference (CIBEC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CIBEC.2012.6473324\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2012 Cairo International Biomedical Engineering Conference (CIBEC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CIBEC.2012.6473324","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 9

摘要

医疗设备管理生命周期考虑从规划到处置或更换的各个阶段。更换决策是医疗设备更换的关键和必要阶段。各种标准有助于做出明智的替换决策。我们增强了故障树分析(FTA)模型,用于医疗设备的更换,综合考虑了技术、财务和安全标准。考虑的标准是;危险和警报、成本、使用寿命和供应商支持。在整个模型中,我们将医疗设备的寿命状态分为四组;更换、测试、监控和保管。根据最终的比赛成绩,决定是否进行换人。利用3家医院的12种不同类型的新生儿重症监护病房(NICU)设备,在3年内对所提出的模型进行了调查。我们的模型提出了应该更换的设备的优先列表。通过对提出的影响因素的分析,发现使用寿命因素是主导因素。此外,还实现了供应商绩效与支出成本之间的高度相关性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
The effect of useful life and vendor performance on replacement decision of medical equipment
Medical equipment management life cycle considers various stages ranging from planning to disposal or replacement. Replacement decision is critical and essential stage of medical equipment. A variety of criteria contributes to make an intelligent replacement decision. We enhance the Fault Tree Analysis (FTA) model for replacement of medical equipment, considering a combination of technical, financial, and safety criteria. The considered criteria are; hazard and alerts, cost, useful life, and vendor support. Throughout this model, we classify medical equipment life status into four groups; replacement, test, surveillance and keep. According to the final event score, the replacement decision is approved or not. Neonatal Intensive Care Unit (NICU) equipment of 12 different types for 3 hospitals, along three years, is utilized to investigate the proposed model. Our model proposes a priority list of equipment that should be replaced. According to the analysis to the proposed factors, the useful life factor is found to be the dominant factor. In addition, a high correlation between vendor performance and expended costs is realized.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
3D automated colon segmentation for efficient polyp detection Pectoral muscle identification in mammograms for Computer Aided Diagnosis of breast cancer High performance multi-dimensional (2D/3D) FFT-Shift implementation on Graphics Processing Units (GPUs) A system dynamics based model for medical equipment maintenance procedure planning in developing countries Accurate analysis of cardiac tagged MRI using combined HARP and optical flow tracking
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1