Zubair Khan Ravindra Singh, Sumit Sanwal, Arun Gangwar, Shabbir Alam
{"title":"基于有限自动机的大规模并行系统任务分配","authors":"Zubair Khan Ravindra Singh, Sumit Sanwal, Arun Gangwar, Shabbir Alam","doi":"10.1109/IADCC.2013.6514298","DOIUrl":null,"url":null,"abstract":"In this paper we are proposing a new approach for tasks allocation in a massively parallel system using Finite Automata. On the basis of task flow model of finite automata., we find the turnaround time for a parallel system using finite automata as a directed acyclic graph in the second section of the paper we discuss regarding the finite automata and directed acyclic graph after that we change finite automata into DAG for massively parallel system. All the simulations are performing in Intel C++ parallel compiler and compare these results with several interesting scheduling algorithms and we get better turnaround time.","PeriodicalId":325901,"journal":{"name":"2013 3rd IEEE International Advance Computing Conference (IACC)","volume":"42 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2013-05-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Task allocation in a massively parallel system using Finite Automata\",\"authors\":\"Zubair Khan Ravindra Singh, Sumit Sanwal, Arun Gangwar, Shabbir Alam\",\"doi\":\"10.1109/IADCC.2013.6514298\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this paper we are proposing a new approach for tasks allocation in a massively parallel system using Finite Automata. On the basis of task flow model of finite automata., we find the turnaround time for a parallel system using finite automata as a directed acyclic graph in the second section of the paper we discuss regarding the finite automata and directed acyclic graph after that we change finite automata into DAG for massively parallel system. All the simulations are performing in Intel C++ parallel compiler and compare these results with several interesting scheduling algorithms and we get better turnaround time.\",\"PeriodicalId\":325901,\"journal\":{\"name\":\"2013 3rd IEEE International Advance Computing Conference (IACC)\",\"volume\":\"42 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2013-05-13\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2013 3rd IEEE International Advance Computing Conference (IACC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IADCC.2013.6514298\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2013 3rd IEEE International Advance Computing Conference (IACC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IADCC.2013.6514298","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Task allocation in a massively parallel system using Finite Automata
In this paper we are proposing a new approach for tasks allocation in a massively parallel system using Finite Automata. On the basis of task flow model of finite automata., we find the turnaround time for a parallel system using finite automata as a directed acyclic graph in the second section of the paper we discuss regarding the finite automata and directed acyclic graph after that we change finite automata into DAG for massively parallel system. All the simulations are performing in Intel C++ parallel compiler and compare these results with several interesting scheduling algorithms and we get better turnaround time.