{"title":"柔性装配系统中的分层调度方法","authors":"R. Graves","doi":"10.1109/ROBOT.1987.1088021","DOIUrl":null,"url":null,"abstract":"The scheduling and dispatching problem for flexible assembly systems operating in a MRP environment is described. These flexible assembly systems (FAS) can perform the required operations on multiple product types which are assembled simultaneously. A non-exact procedure is presented as the basis for SCHEDULER and DISPATCHER functionality in a hierarchical scheduling system design.","PeriodicalId":438447,"journal":{"name":"Proceedings. 1987 IEEE International Conference on Robotics and Automation","volume":"28 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1987-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"11","resultStr":"{\"title\":\"Hierarchical scheduling approach in flexible assembly systems\",\"authors\":\"R. Graves\",\"doi\":\"10.1109/ROBOT.1987.1088021\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The scheduling and dispatching problem for flexible assembly systems operating in a MRP environment is described. These flexible assembly systems (FAS) can perform the required operations on multiple product types which are assembled simultaneously. A non-exact procedure is presented as the basis for SCHEDULER and DISPATCHER functionality in a hierarchical scheduling system design.\",\"PeriodicalId\":438447,\"journal\":{\"name\":\"Proceedings. 1987 IEEE International Conference on Robotics and Automation\",\"volume\":\"28 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1987-03-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"11\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings. 1987 IEEE International Conference on Robotics and Automation\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ROBOT.1987.1088021\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings. 1987 IEEE International Conference on Robotics and Automation","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ROBOT.1987.1088021","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Hierarchical scheduling approach in flexible assembly systems
The scheduling and dispatching problem for flexible assembly systems operating in a MRP environment is described. These flexible assembly systems (FAS) can perform the required operations on multiple product types which are assembled simultaneously. A non-exact procedure is presented as the basis for SCHEDULER and DISPATCHER functionality in a hierarchical scheduling system design.