在处理项目成本和风险时,项目管理应使用人工智能驱动的算法

Dag H Zeiner-Gundersen
{"title":"在处理项目成本和风险时,项目管理应使用人工智能驱动的算法","authors":"Dag H Zeiner-Gundersen","doi":"10.54026/ctes/1010","DOIUrl":null,"url":null,"abstract":"costs, as function of project progress throughout the various development stages. This pertains to most project categories whether it is infrastructure development or the development of systems or product and services. Thus, much can be achieved by addressing such cost optimization and related risks early, with alternative paths and foresee cascade effects when executing individual project activities. Thereby avoiding accelerating costs and detrimental cascade effects.","PeriodicalId":371070,"journal":{"name":"Current Trends in Engineering Science (CTES)","volume":"171 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-02-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Project Management Shall Use Artificial Intelligence (AI) Driven Algorithms When Addressing Project Costs and Risks\",\"authors\":\"Dag H Zeiner-Gundersen\",\"doi\":\"10.54026/ctes/1010\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"costs, as function of project progress throughout the various development stages. This pertains to most project categories whether it is infrastructure development or the development of systems or product and services. Thus, much can be achieved by addressing such cost optimization and related risks early, with alternative paths and foresee cascade effects when executing individual project activities. Thereby avoiding accelerating costs and detrimental cascade effects.\",\"PeriodicalId\":371070,\"journal\":{\"name\":\"Current Trends in Engineering Science (CTES)\",\"volume\":\"171 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-02-10\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Current Trends in Engineering Science (CTES)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.54026/ctes/1010\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Current Trends in Engineering Science (CTES)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.54026/ctes/1010","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

成本,作为贯穿各个开发阶段的项目进度的函数。这适用于大多数项目类别,无论是基础设施开发还是系统或产品和服务的开发。因此,在执行单个项目活动时,通过早期处理这种成本优化和相关风险,以及可选择的路径和预见的级联效应,可以实现很多目标。从而避免加速成本和有害的级联效应。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Project Management Shall Use Artificial Intelligence (AI) Driven Algorithms When Addressing Project Costs and Risks
costs, as function of project progress throughout the various development stages. This pertains to most project categories whether it is infrastructure development or the development of systems or product and services. Thus, much can be achieved by addressing such cost optimization and related risks early, with alternative paths and foresee cascade effects when executing individual project activities. Thereby avoiding accelerating costs and detrimental cascade effects.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
AI Revolution: Safeguarding Tomorrow’s Frontiers - Transforming Cybersecurity Across Industries (A Short Approach) Agrooter® - Skillful Natural Tubes to Enhance Soil Productivity and Manage Hydric Stress Edgar Allan Poe’s The Fall of the House of Usher: Thoughts on an Architecture of Terror Grand Challenges of the 21st Century Warranting A Shift in Geoenvironmental Engineering Eco-Resilient (ECORE) Concrete Constructions: A New Challenge and A New Concept
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1