堵塞诱导裂缝,提高水驱波及效率

IF 0.8 Q3 ENGINEERING, PETROLEUM Georesursy Pub Date : 2023-09-30 DOI:10.18599/grs.2023.3.18
Konstantin M. Fedorov, Ivan V. Vydysh, Alexander V. Kobyashev, Alexander S. Gavris’
{"title":"堵塞诱导裂缝,提高水驱波及效率","authors":"Konstantin M. Fedorov, Ivan V. Vydysh, Alexander V. Kobyashev, Alexander S. Gavris’","doi":"10.18599/grs.2023.3.18","DOIUrl":null,"url":null,"abstract":"Waterflooding of low-permeable reservoirs with high pressure is often accompanied by formation of induced fracture. The positive side of this process is an injectivity increase and oil production rise. However, when these fractures approach producing wells, an early water breakthrough occurs, and high productivity channels are formed between the injection and producing wells. The technology of fracture clogging, for example, by suspension composition injection into an injection well, allows reducing the length of the fracture. The paper considers the problem of the fracture size reducing process on the waterflood sweep efficiency. The example of a reverse five–point waterflood pattern was investigated. In the basic calculation run, fracture length was constant during all process. The run with transformable fracture length is compared with the basic one. The results of calculations showed that the process of waterflooding after fracture impact could be divided into the following stages. The first one, which follows immediately after the fracture clogging, demonstrates a water cut decrease and an oil production rate increase. The second, in which the oil production declines below the base variant. On the third stage, there is a low, but long-term increase in oil production due to increased waterflood sweep efficiency. The authors established that monitoring of induced fractures length is relevant, since timely fractures clogging allows to increase oil production after the well treatment and to incline the oil recovery coefficient through increasing waterflood sweep efficiency.","PeriodicalId":43752,"journal":{"name":"Georesursy","volume":null,"pages":null},"PeriodicalIF":0.8000,"publicationDate":"2023-09-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Clogging of induced fracture to increase waterflood sweep efficiency\",\"authors\":\"Konstantin M. Fedorov, Ivan V. Vydysh, Alexander V. Kobyashev, Alexander S. Gavris’\",\"doi\":\"10.18599/grs.2023.3.18\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Waterflooding of low-permeable reservoirs with high pressure is often accompanied by formation of induced fracture. The positive side of this process is an injectivity increase and oil production rise. However, when these fractures approach producing wells, an early water breakthrough occurs, and high productivity channels are formed between the injection and producing wells. The technology of fracture clogging, for example, by suspension composition injection into an injection well, allows reducing the length of the fracture. The paper considers the problem of the fracture size reducing process on the waterflood sweep efficiency. The example of a reverse five–point waterflood pattern was investigated. In the basic calculation run, fracture length was constant during all process. The run with transformable fracture length is compared with the basic one. The results of calculations showed that the process of waterflooding after fracture impact could be divided into the following stages. The first one, which follows immediately after the fracture clogging, demonstrates a water cut decrease and an oil production rate increase. The second, in which the oil production declines below the base variant. On the third stage, there is a low, but long-term increase in oil production due to increased waterflood sweep efficiency. The authors established that monitoring of induced fractures length is relevant, since timely fractures clogging allows to increase oil production after the well treatment and to incline the oil recovery coefficient through increasing waterflood sweep efficiency.\",\"PeriodicalId\":43752,\"journal\":{\"name\":\"Georesursy\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.8000,\"publicationDate\":\"2023-09-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Georesursy\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.18599/grs.2023.3.18\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"ENGINEERING, PETROLEUM\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Georesursy","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.18599/grs.2023.3.18","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, PETROLEUM","Score":null,"Total":0}
引用次数: 0

摘要

高压低渗透油藏注水开发往往伴随着诱发裂缝的形成。这一过程的积极方面是注入能力的增加和石油产量的增加。然而,当这些裂缝接近生产井时,就会早期见水,在注入井和生产井之间形成高产能通道。例如,通过向注水井中注入悬浮组合物来封堵裂缝的技术可以缩短裂缝的长度。研究了裂缝尺寸减小过程对水驱波及效率的影响。研究了反向五点注水模式的实例。在基本的计算运行中,裂缝长度在整个过程中都是恒定的。并将裂缝长度可变换的井眼与基本井眼进行了比较。计算结果表明,裂缝冲击后的水驱过程可分为以下几个阶段:在裂缝堵塞后立即进行的第一次测试表明,含水率降低,产油量增加。在第二种情况下,石油产量下降到基础变量以下。在第三阶段,由于水驱波及效率的提高,石油产量有一个低但长期的增长。作者认为,监测诱导裂缝长度是有意义的,因为及时封堵裂缝可以在油井处理后提高产油量,并通过提高水驱波及效率来提高采收率系数。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Clogging of induced fracture to increase waterflood sweep efficiency
Waterflooding of low-permeable reservoirs with high pressure is often accompanied by formation of induced fracture. The positive side of this process is an injectivity increase and oil production rise. However, when these fractures approach producing wells, an early water breakthrough occurs, and high productivity channels are formed between the injection and producing wells. The technology of fracture clogging, for example, by suspension composition injection into an injection well, allows reducing the length of the fracture. The paper considers the problem of the fracture size reducing process on the waterflood sweep efficiency. The example of a reverse five–point waterflood pattern was investigated. In the basic calculation run, fracture length was constant during all process. The run with transformable fracture length is compared with the basic one. The results of calculations showed that the process of waterflooding after fracture impact could be divided into the following stages. The first one, which follows immediately after the fracture clogging, demonstrates a water cut decrease and an oil production rate increase. The second, in which the oil production declines below the base variant. On the third stage, there is a low, but long-term increase in oil production due to increased waterflood sweep efficiency. The authors established that monitoring of induced fractures length is relevant, since timely fractures clogging allows to increase oil production after the well treatment and to incline the oil recovery coefficient through increasing waterflood sweep efficiency.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Georesursy
Georesursy ENGINEERING, PETROLEUM-
CiteScore
1.50
自引率
25.00%
发文量
49
审稿时长
16 weeks
期刊最新文献
Issues of rational subsoil use in modern conditions Refinement of the geological model of Jurassic deposits accounting the results of stochastic inversion and facies modeling The permanent temperature monitoring for flow rate quantification in production and injection wells Mineralogical and technological features of gold from placers of the southern slope of Belaya Gora (Khabarovsk Krai) and stages of its formation About micro- and nanoscale gold in the veil of gold-bearing territories (on the example of a mineralization site in the basin of the river Adamikha, Amur region)
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1