{"title":"电池发电机设计","authors":"Bitson Nerpandi Hutapea, Ganda Sirait","doi":"10.33884/comasiejournal.v9i8.7992","DOIUrl":null,"url":null,"abstract":"Many factors could affect electricity distribution to seclusion places or the outer part of an island that needs electricity, for instance the power plant center is located very far away, low population, and difficult access to electricity. This is a design to establish a battery power generator that has the same concept with a common generator that could result in electricity power up to 36 kWh, this power can supply electricity to 30 houses with 1,2 kWh for each house. The goal of this research is to re-designing a generator by considering user needs. A survey had been made to acknowledge what customers might need from this product and axiomatic design is used to compile a parameter design using mapping process from customer attribute and functional requirement.","PeriodicalId":500489,"journal":{"name":"Computer and Science Industrial Engineering (COMASIE)","volume":"48 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-10-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"RANCANGAN ALAT PEMBANGKIT LISTRIK TENAGA BATERAI\",\"authors\":\"Bitson Nerpandi Hutapea, Ganda Sirait\",\"doi\":\"10.33884/comasiejournal.v9i8.7992\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Many factors could affect electricity distribution to seclusion places or the outer part of an island that needs electricity, for instance the power plant center is located very far away, low population, and difficult access to electricity. This is a design to establish a battery power generator that has the same concept with a common generator that could result in electricity power up to 36 kWh, this power can supply electricity to 30 houses with 1,2 kWh for each house. The goal of this research is to re-designing a generator by considering user needs. A survey had been made to acknowledge what customers might need from this product and axiomatic design is used to compile a parameter design using mapping process from customer attribute and functional requirement.\",\"PeriodicalId\":500489,\"journal\":{\"name\":\"Computer and Science Industrial Engineering (COMASIE)\",\"volume\":\"48 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-10-09\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Computer and Science Industrial Engineering (COMASIE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.33884/comasiejournal.v9i8.7992\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Computer and Science Industrial Engineering (COMASIE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33884/comasiejournal.v9i8.7992","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

许多因素会影响电力分配到僻静的地方或需要电力的岛屿外部,例如发电厂中心距离很远,人口少,难以获得电力。这是一个设计,建立一个电池发电机的概念与普通发电机相同,可以产生高达36千瓦时的电力,这个电力可以为30个家庭供电,每个家庭1.2千瓦时。本研究的目标是通过考虑用户需求来重新设计发电机。通过问卷调查了解客户对该产品的需求,采用公理设计法从客户属性和功能需求进行映射,编制参数设计。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
RANCANGAN ALAT PEMBANGKIT LISTRIK TENAGA BATERAI
Many factors could affect electricity distribution to seclusion places or the outer part of an island that needs electricity, for instance the power plant center is located very far away, low population, and difficult access to electricity. This is a design to establish a battery power generator that has the same concept with a common generator that could result in electricity power up to 36 kWh, this power can supply electricity to 30 houses with 1,2 kWh for each house. The goal of this research is to re-designing a generator by considering user needs. A survey had been made to acknowledge what customers might need from this product and axiomatic design is used to compile a parameter design using mapping process from customer attribute and functional requirement.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
IMPLEMENTASI DATA MINING MENGGUNAKAN ALGORITMA APRIORI UNTUK MENINGKATKAN POLA PENJUALAN ANALISIS RISIKO ERGONOMI PENJAHIT BERDASARKAN JENIS KELAMIN DI KOTA BATAM ANALISIS DAN DETEKSI MALWARE PADA PROTOKOL JARINGAN MENGGUNAKAN METODE MALWARE ANALISIS DINAMIS DAN MALWARE ANALISIS STATIS ANALISIS POLA PEMBELIAN KONSUMEN MENGGUNAKAN ALGORITMA APRIORI PERANCANGAN SISTEM APLIKASI PENJUALAN SPAREPART MOTOR BERBASIS ANDROID
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1