综合揭示了建筑分包商少付款背后的复杂性

Mohammad Mayouf, Ciaran Gilligan
{"title":"综合揭示了建筑分包商少付款背后的复杂性","authors":"Mohammad Mayouf, Ciaran Gilligan","doi":"10.1108/jfmpc-06-2022-0026","DOIUrl":null,"url":null,"abstract":"Purpose In construction projects, underpayments can be recognised as one of the significant drawbacks that impact the success of a project. Research into underpayments is considered ambiguous and provides a limited reflection of the issue, which makes it complicated to trace how it originates in the first place. This study aims to examine the causes that lead to underpayments and develop a holistic synthesis of underpayments for subcontractors in the lifecycle of a construction project. Design/methodology/approach An open-ended and closed-ended questionnaire was used to collect the data using purposeful sampling with 28 construction stakeholders who ranged from main contractors, subcontractors and others (Small medium enterprises SMEs, Consultancies, Clients etc.). Data collected was analysed to trace drivers and the impact of underpayment and suggested mitigation strategies to be identified whilst viewing the perspectives of a main contractor and subcontractor. Findings The findings show that the most prominent driver for underpayments is variation disputes followed by cash flow. The research also suggests mitigation strategies such as collaborative working, more robust budget control and early identification of risks as potential remedies to overcome the underpayment issue. The research concludes with a framework that elicits the complexity underlying underpayments for subcontractors in construction projects. Originality/value The research evolves the understanding that underpayment is a complex phenomenon, relying heavily on the data/information exchange mechanism between the main contractor and subcontractors. This research provokes the need to understand underpayment further so it can be mitigated.","PeriodicalId":45720,"journal":{"name":"Journal of Financial Management of Property and Construction","volume":"185 1","pages":"0"},"PeriodicalIF":1.2000,"publicationDate":"2023-09-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Synthesis towards unveiling the complexity underlying underpayment for subcontractors in construction\",\"authors\":\"Mohammad Mayouf, Ciaran Gilligan\",\"doi\":\"10.1108/jfmpc-06-2022-0026\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Purpose In construction projects, underpayments can be recognised as one of the significant drawbacks that impact the success of a project. Research into underpayments is considered ambiguous and provides a limited reflection of the issue, which makes it complicated to trace how it originates in the first place. This study aims to examine the causes that lead to underpayments and develop a holistic synthesis of underpayments for subcontractors in the lifecycle of a construction project. Design/methodology/approach An open-ended and closed-ended questionnaire was used to collect the data using purposeful sampling with 28 construction stakeholders who ranged from main contractors, subcontractors and others (Small medium enterprises SMEs, Consultancies, Clients etc.). Data collected was analysed to trace drivers and the impact of underpayment and suggested mitigation strategies to be identified whilst viewing the perspectives of a main contractor and subcontractor. Findings The findings show that the most prominent driver for underpayments is variation disputes followed by cash flow. The research also suggests mitigation strategies such as collaborative working, more robust budget control and early identification of risks as potential remedies to overcome the underpayment issue. The research concludes with a framework that elicits the complexity underlying underpayments for subcontractors in construction projects. Originality/value The research evolves the understanding that underpayment is a complex phenomenon, relying heavily on the data/information exchange mechanism between the main contractor and subcontractors. This research provokes the need to understand underpayment further so it can be mitigated.\",\"PeriodicalId\":45720,\"journal\":{\"name\":\"Journal of Financial Management of Property and Construction\",\"volume\":\"185 1\",\"pages\":\"0\"},\"PeriodicalIF\":1.2000,\"publicationDate\":\"2023-09-18\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Financial Management of Property and Construction\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1108/jfmpc-06-2022-0026\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"BUSINESS, FINANCE\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Financial Management of Property and Construction","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/jfmpc-06-2022-0026","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"BUSINESS, FINANCE","Score":null,"Total":0}
引用次数: 0

摘要

在建设项目中,欠付款是影响项目成功的一个重要缺陷。对欠付的研究被认为是模棱两可的,并且对这个问题的反映有限,这使得追踪它最初是如何产生的变得复杂。本研究旨在研究导致少付款的原因,并在建筑项目的生命周期中对分包商的少付款进行全面综合。设计/方法/方法采用开放式和封闭式问卷,对28个建筑利益相关者进行有目的的抽样,收集数据,这些利益相关者包括主承包商、分包商和其他(中小型企业、中小企业、咨询公司、客户等)。对收集的数据进行了分析,以追踪驱动因素和少付款的影响,并在查看主承包商和分包商的观点时提出了要确定的缓解战略建议。研究结果表明,导致少付的最主要驱动因素是差异纠纷,其次是现金流。该研究还建议采取缓解战略,如协作工作、更有力的预算控制和及早发现风险,作为克服付款不足问题的潜在补救措施。该研究总结了一个框架,该框架引出了建筑项目中分包商欠付款的复杂性。该研究使人们认识到,欠付款是一个复杂的现象,严重依赖于主承包商和分包商之间的数据/信息交换机制。这项研究激发了进一步了解支付不足的必要性,以便减轻这种情况。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Synthesis towards unveiling the complexity underlying underpayment for subcontractors in construction
Purpose In construction projects, underpayments can be recognised as one of the significant drawbacks that impact the success of a project. Research into underpayments is considered ambiguous and provides a limited reflection of the issue, which makes it complicated to trace how it originates in the first place. This study aims to examine the causes that lead to underpayments and develop a holistic synthesis of underpayments for subcontractors in the lifecycle of a construction project. Design/methodology/approach An open-ended and closed-ended questionnaire was used to collect the data using purposeful sampling with 28 construction stakeholders who ranged from main contractors, subcontractors and others (Small medium enterprises SMEs, Consultancies, Clients etc.). Data collected was analysed to trace drivers and the impact of underpayment and suggested mitigation strategies to be identified whilst viewing the perspectives of a main contractor and subcontractor. Findings The findings show that the most prominent driver for underpayments is variation disputes followed by cash flow. The research also suggests mitigation strategies such as collaborative working, more robust budget control and early identification of risks as potential remedies to overcome the underpayment issue. The research concludes with a framework that elicits the complexity underlying underpayments for subcontractors in construction projects. Originality/value The research evolves the understanding that underpayment is a complex phenomenon, relying heavily on the data/information exchange mechanism between the main contractor and subcontractors. This research provokes the need to understand underpayment further so it can be mitigated.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
3.70
自引率
0.00%
发文量
17
期刊最新文献
Managing supply chain disruptions in the construction industry: an institutional approach Assessing risk allocation preferences of partners in international construction joint venture projects in Ghana Impact of time-based delay on public-private partnership (PPP) construction project delivery: construction stakeholders’ perspective Drivers for the adoption of building information modelling (BIM) for post-construction management in the Nigerian AECO industry Risk assessment for 3D printing in construction projects
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1